Loading...
Freeport NIP(2.3)-CS 96061906/19 '96 07:53 ~14 386 05?8 ID:MAY~, ASSOC. II! M A Y $ E & A ~ S O C I A T E .S FAX:214-386~'~,78 & R C H I T E C f $ , PAGE INC. attention: company name: fax number: phone number: F AX C O V E R S H E E T job number: subject: from: date: total nt~mber o1' [)a~es: . (including cover sheet) 14850 Q~n.,Jm Drlv. S.Ite 201 Dallaa fexa~ 75240 214 306 0338 fA)~ 214 306 057§ 06/19 '96 07:54 CONFERENCE REPORT PROJECT: ID:MAYS,~, ASSOC. Quill Corporation Regional Distribution Center Coppell, TX FAX:214-386.;.~78 PAGE II! ~o ~ o,.. ~ ~-~'i pl~ Texo~ 7~240 12 ~ ,f,) 38S-0~38 PROJECT NO: 9614 DATE: June 18, 1996 CONCERNING: PARTICIPANTS: City of Coppell Requirements Tom Morion, Jim Wit, Clay Phillips, Travis Crump, Creg Jones, Gary Seib.~Ken Gd~in, Harvey Miller, Terry SchwarUn& Geoqte Kern, -Jim Mc~lroy,'MJke Peeples~ Mike Mayse DISCUSSIONS & CONCEUSION$ Meetin$ was convened to dlscur~ Issum with the City of Coppell afl'etOn8 eady stockin8 of the bullding~ Certificate of Occupancy and partial CertJficale of Occupancy and to resolve'any outstandin8 en~neerln8 Issues. The following was discussed: 1. It is the desire of Quill Corporation to be shipping product by November of 1996 which will require ~3cklng the building in October. A partial Certificate of Occupancy for the warehout, e would need to be iit~ued ¢n¢~ the entire building would not be completed by this time. The dty would require the following in order to Issue a partial C.O. for {he warehouse. A. Fire Lane~ and hydrants to be complete and operational. B. Fire sprinkler and fire alarm in warehouse to be operational. C. Inspection and approval by the Bldg Dept and Fire Dep{ prior to receivin8 slx3ck 2 The City requefzed that in order to avoid delays, inspections should be requested one to two months prior to the date. scheduled to receive stock. 3 If landscapin8 is not in,lied prkx to date of requested occupancy and Owner would like to defer planting undl sprin& a bond in the amount of 110~ of the cost of landscaping can be posted with the City, refundable upon completion of the landscapin8 and Irrigation. 4. In order for inspection to occur, Fire splnkler shop. drawings and Fire Alarm System drawings mint be submitted and approved by the City prior to Installation. ~ The storm sewer Issue was discussed with Ken Griffin, Mike Peeples and Jim McEIroy. The city indicated that the existin8 system was insLalled by the old Municipal Utility Disulct prior to jurisdiction by the City, and does not meet current City standards. In order to accomodate the addiUonal storm water runoff created by new development~ several ~oluUons and alternative were discussed that would be acceptable to the City as follows:~r'~ 1. A parallel pipe system could be Installed to handle he e~cess runoff (rom Quill to the exl~nl~42'~lla pipe on the property south of Quill. 2. An ear,hen swale could be constucted to conduct the exoes~ runoff form the Quill property to the c~eek to the south. 3. A combination of the above. Pa~e 1 of 2 06×i9 '96 07:54 ID:MAYS,~ ASSOC. FAX:214-386,~578 PAGE 3 CONFFREN~ REPORT June 18, 1996 __Qu'il! Corooration / Quill was to analyze the cost of each option and notify the city of their selected option. The CILy asreed to inve~isate the possibility of assessin8 an Impact fee on the adjacent property owners to reimbuse Quill in the event that Quill chooses to improve the eixllJng system with a parallel pipe. The city considered the earthen swale option as a tempory condition and would require that the existin$ system be improved with the parallel pipe before the City would 8rant permit approval for the proposed buildin8 expan~on. These notes, co. nvey.ou..r.understand!n8 of items dlscu~sed and eor~:ludom readted durinli this confeaence. These conclusions srlall oe ac;r. epto(I as correct unless oUlen~so notlflecl in writing within'ten days. COPIES TO: ParUdpants FILE: 9614 Mike Mayse ® 0 0 [] BY: Please call if there are any problems With th~ t~ansmlsalon. 06/1.9 '96 07:54 ! D :i,i~YS,,~, pssoc. FCtX: 21zl-386,.~78, iLI~I lB 'cJ6 14:57 M]~CHP~.iL F~EPtE~ ~ E14-E4B-5747 P~GE 4 Michael Po=pies June 14, 1996 14850 ~.~ort~m D~Ave Su/Ce 201 Dallas, Texas ?5240 0~fstce Storm Sewer System . . Adjacent ~0 che QuiLl Site*aC ........... Royal Z..ane and Gacevtew Lane Dear Mike, Zn reference co 7our request concerning the cos~ of ~he ons~=e and of£s~e drainage co complete =he project, ye have made the ~ollowing aSlum~Cions: The offeite s~o~m li~le c~n be =~ed ~n2o the [nl.et aC the heed o~ the 4e' e~orm 8ewer, in other wo~fls no new struc2ure would b~ required. The hydraulics oaloulatLons will bear sun the assumptions made. NO conm~dera~i~n hms been made The costs are a0 £ollows: 1. S~orva Sewer (295 L.F. - ~0# 2. Tie ln~o ~he Ex. S~orm oo' %*5 ~- ,$ubCoC&& O~ite Line: 1. SCo~ Sewer (480 L.P. - 30" RCP 2. T~e into ~he New Offside ~9tneering and Contingencies: Combination 0nsice/offsite Line: 15,045 GO0 045 24,480 S00 4~,025'. 4,205 TOTAL ALL COSTS: $ 46,230 46~0 Sun~t D~as, Texas 75,246 06/'19 '96 07:55 ID:II~YS~ ASSOC. FAX:214-386,,7,,~TS ' J~ 18 '96 14'57, MICHAEL PEEPLES EN~ ~14-E48-3747 PAGE £OllOvs; I 2. T~o O~gsiCe swale can be gzaded to tie into the #Ord8 no nov sc~Ac~ure vould be ~equiFed. 3. Tho hydraulics calculations v£11 boar out the assumptions made. NO conoiderl~ion hal been ua do pipe ties into in ~heSe calcula~Aon~ O~£si~e Swale~ ~. r~xclvation and Shaping 200 1.~. ditch (~00 c.y. · $30/e.7) sub,s:al Ongite Line: I. Storm Sewer (480 2. Tie in~o the New O~o~to bins Subtotal Bngineering and Con~in~encie,; Co~in&cion'O~ite/O££.lCe Bv&,le: TOTAL AL~ C09TS: Please call me 1£ you have &nM questions. 3,000 3,boo 24, &BO ::, .980 i 30,?70 43,03~ MiChael N. Peoples, ~.g' 06/19 '96 07:55 ID:MaYS~ ~SSOC. , JUN 18 ~9~ 14:58 MImCH~L PEEPLES EMG FAX: ~ 14-386,,Z,~78 17 P~GE 6 ENGINEERING DEPAR P.O. BOX 478 255 PARKWAY BLVD. COPPELL. TX 75019 FAX NO. (214) TMENT FAX CO VER SHEET TO: ~.~ FIRM: TRANSMITTED BY: FROM: ~ PHONE NO.: DATE: {~ ' TIME: (0': NUMBER OF PAGES (INCLUDING COVER REMARKS: SHEET) IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (214.) 304-3679. ENGINEERING DEPAR FAX COVER P.O. BOX 478 255 PARKWAY BLVD. COPPELL, TX 7501g FAX NO. (214) 304-3~70 TMENT SHEET FROM: ~___~~__~"% FIRM: FAX NO: ~Z ~'~ 3-;~'7 TRANSMITTED BY' PHONE NO.: DATE: ~) ' I o) ,~ b TIME: I '0 '. ~ 0 NUMBER OF PAGES (INCLUDING COVER SHEET) IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (214.) .904-,.9679.