Loading...
Gateway BP(1.4)-LR171103 FOUNDATION OBSERVATIONS REPORT Report Number:94171346.0032 Service Date:11/03/178901 Carpenter Fwy Ste 100 Report Date:11/10/17 Dallas, TX 75247-4547 214-630-1010 Reg No: F-3272 ClientProject Haverty Furniture Co IncHaverty's Warehouse Expansion Attn: Glenn Boone770 Gateway Blvd 780 Johnson Ferry Rd NE Ste 800Coppell, TX 75019 Atlanta, GA 30342 Project Number: 94171346 On today’s date, Terracon’s representative arrived onsite for the drilled pier observations. Pier at B/3 (276) was drilled to a depth of approximately 38.0’ where unweathered gray shale was found. A sandy material was encountered directly above this layer that sloughing/caving of the side walls was observed. Drilling was stopped at this time and the pier hole was backfilled. Casing will be needed to complete this pier. Services: Drilled pier observation. Terracon Rep.: George Tsougarakis Reported To: Contractor: Report Distribution: (1) Haverty Furniture Co Inc, Glenn (1) City of Coppell TX, Marcus Marion Boone (1) Kajima Building & Design Group Inc., (1) Kajima Building & Design Group Inc., Reviewed By:____________________________________ Craig FarwickJuan Hernandez (1) Macgregor Assoc Architects, James D. Baze Muhammed Dikko Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1