Gateway BP(1.4)-LR171108 (2)
FOUNDATION OBSERVATIONS REPORT
Report Number:94171346.0043
Service Date:11/08/178901 Carpenter Fwy Ste 100
Report Date:11/10/17 Dallas, TX 75247-4547
214-630-1010 Reg No: F-3272
ClientProject
Haverty Furniture Co IncHaverty's Warehouse Expansion
Attn: Glenn Boone770 Gateway Blvd
780 Johnson Ferry Rd NE Ste 800Coppell, TX 75019
Atlanta, GA 30342
Project Number: 94171346
On this date, Terracon’s representative arrived onsite for the drilled pier operation but was informed that the drilling was being cancelled
due to weather. Drilling will resume at a later date.
Services: Drilled pier observation.
Terracon Rep.: George Tsougarakis
Reported To:
Contractor:
Report Distribution:
(1) Haverty Furniture Co Inc, Glenn (1) City of Coppell TX, Marcus Marion
Boone
(1) Kajima Building & Design Group Inc., (1) Kajima Building & Design Group Inc.,
Reviewed By:____________________________________
Craig FarwickJuan Hernandez
(1) Macgregor Assoc Architects,
James D. Baze
Muhammed Dikko
Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
BC0001, 10-16-13, Rev.10 Page 1 of 1