WA9302-CN 960924 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Village Parkway 2nd Ground Storage Tank / WA 93-02 CONTRACTOR: NATGUN Corporation OWNER: City of Coppell CHANGE ORDER NO.: 1 DATE: 9/23/96 CHANGE OR EXTRA WORK TO BE DONE Item Description Quantity Unit Unit Price Total ADD: 1 Reroute conduit and 1 LS 2,843.40 $2,843.40 extend Circuit 150' including overhead and profit Total Revision to Contract Amount $ 2,843.40 Previous contract amount $ 2,809,305.00 Net increase in contract amount $ 2,843.40 Revised contract amount $ 2,812,148.40 Net increase in contract time of completion N/A Revised Contract time of completion N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. the Owner: Date: 9-24-96 '89/23/i996 i3:15 2i436i82Jai SHIMEK,JACOBS&FINKLE PAGE 03/~G CITY OF COPPELL, TEXAS VILLAGE PARKWAY GROUND STORAGE RESERVOIR NO. 2 CHANGE ORDER NO. 1 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Natgun Corporation, 11 Teal Road, Wakefield, Massachusetts 01880-12592, for construction of the Village Parkway Ground Storage Roservoir No. 2, dated May 23, 1995. B. DESCRIPTION OF.,CHANGE Change Order No. 1 covers the additional work required to re-route the conduit feeding the pole lights on the Village Parkway Ground Storage Reservoir No. 2 and extend the circuit by 150 feet. The construction record drawings for the pump station showed a power conduit installed under the concrete drive around the existing tank. Apparently, the conduits were not installed as shown. The City of Coppell will reimburse Natgun Corporation for the additional work in the lump sum mount shown below. C. EFF~C..T. OF CHANGE ON CONTRACT A~MOUNT This change order will have the following effect on the cost of this project: Item ...... ]Original Quantity ] Revised ~ Unit Amount No. , Description , , Quantity Th~ C.O. Quantity Unit Pr~c,e of Change I Re-route Conduit and Extend Circuit 0 I 1 L.S. $2,843.40 $2,843A0 150 feet including Overhead and Profit Total: $2,843.40 Original Contract Amount $2,809,305.00 Amount, Change Order No. 1 $2,843.40 Revised Contract Amount $2,812,148.40 D. EFFECT_OF CHANGE ON CONTRA, CT TLME The work required under this change order will add no additional calendar days to this project. Original Contract Time 300 calendar days Time, Change Order No. 1 0 calendar days Revised Contract Time 300 calendar days 9.,2r1,'96 Page ] of 2 ' FAX I Pmt~ September 20, 1996 Number ofpege~ inCludin~l cover ~eer TO: Gary C. Hendricks Shimek, Jacobs & Finklea FROM: Anthony L. DiGiovanni Suite 820 Natgun Corporation 8333 Douglas Avenue 11I Teal Road Dallas, Texas 75225 Wakefield, MA 01880 RE: Coppail, Texas Project I~hone 214-361-7900 Fax Phone 214-361-0204 l~hone 6f 7.224-5135 Fax Phone 617-224-5153 REMARKS: [] Urgent [] For your review [] Reply ASAP [] Please Comment Attached is the extra cost fOrm-routing electrical conduit to the pole ligh! on the above referenced project. The total cost for this work is $2.843.40 and breaks down as follows: Abre Service Company $2.708.00 Natgun 0 & P (5%) 135_40 $2,843.40 We would appreciate your immediate attention in approving a change order. If you have any question, please give us a call. Attachment Pc sox 540e0e Oallss, TX 75220 Phone: (Zl&) 350~5721 Fax: (214) 350-0839 DATE: SEPTEMBER 19. 1996 TO: NATGUN CORPORATION ELEVEN TEAL ROAD WAKEFIELD, HA 01880-1292 ATTN: MR. FREDRICK A. MCDONOUGH JR.~'~ VICE-PRESIDENT-CONSTRUCTiON TT'A,/. -Z]'C)~ FROH: GAYLON MCKNIGHT ESTIMATOR/PROJECT MANAGER RE: 6.0 MG VILLAGE PARKWAY GROUND STORAGE RESEVOIR NO. 2 PROJECT No. WA-9302 COPPELL, TEXAS TO RE-ROUTE THE CONOUIT FEEDING THE POLE LIGHTS ON THE REFERENCED PROJECT AND EXTEND THE CIRCUIT BY 150 FT,, WE SUBMIT THE SUM $2.708.00 SCOPE OF WORK~ FURNISH & INSTALL; 150 FT, OF 1" PVC COATED RIGID CONDUIT WiTH THE WIRE, FITTINGS, SLICE KITS, AND ROCK TRENCHING REQUIRED =iNCLUDES= 1) PERMIT, LICENSE, AND INSURANCE ~) COMPLIANCE WITH THE NATIONAL ELECTRIC CODE ,CITY AND STATE LAWS AND OR01NANCE5 PLEASE ADVISE BY CHANGE ORDER TO OUR CONTRACT IF YOU WiSH FOR US TO PROCEED WITH THIS CHANGE IN OUR SCOPE OF WORK. SINCERELY, ABLE SERVICE COMPANY GAYLON MCKNIGHT