Fairfield-CS171114 THOMAS HOOVER ENGINEERING, LLC November 14, 2017 Mr. George S. Marshall, PE Engineering Manager Engineering & Public Works City of Coppell Re: Plan Revisions Fairfield Inn — Coppell, Texas p Dear Mr. Marshall: We have been asked by the Owner/Developer of the Fairfield Inn by Marriott to make changes to the approved plans. As you may recall, the original construction plans were modified to accommodate the surface drainage entering the hotel site from the Storage facility adjoining the site. Our office prepared the drainage revisions to address the concerns of the City, Owner, and the Storage facility. Those plans generally installed 12" underground piping along the north property line. Three area drains were included along with modification to the curbing at the north entry road. The area along the east property line only required an earthen swale to be installed that would convey the drainage to the eastmost northeast corner. It is our understanding that these revisions were accepted by the Storage facility and authorized to be installed by the City. After the plans were reviewed and authorized by the City, the Owner/Developer of the Fairfield Inn was interested in providing an additional emergency overflow along the east property line. We recommended that an additional area drain be installed near the parking island in the earthen swale. This drain would function as an emergency overflow should the area drains along the north property become obstructed. We request that the City consider allowing the installation of the second emergency overflow in the plans attached herewith. Your consideration is greatly appreciated. OFTF,r`11 Respectfully submitted, ;*co." '4 " •qs *l�, Thomas • os - -r Ens ineerin LLC ......•"'`""./ / THOMAS L. HOOVER../ ...62493 / .1 ,�.,l/CENs� ����� Thomas L Hoover, PE '‘�,"ONA`E�— P.O. Box 1808, Keller, TX 76244 817-913-1350 phone T.B.P.E. Firm Registration No. 006009