Petterson (Encore)-CS171204 Priscilla Martinez From:Scott Latta Sent:Monday, December 04, 2017 7:51 AM To:Drew Donosky; George Marshall Cc:Priscilla Martinez; Darryl Zbranek; Kevin Rubalcaba; Leah Bowyer Subject:RE: 2017-09-12 Petterson Addition Civils_v3.pdf Also, we are still in need of the PDF and DWG for this project. From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Monday, December 04, 2017 7:01 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <WLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf George, Please find the revised utility plans attached. We have raised the sanitary sewer to be a standard depth per the discussion had at the precon. Let me know if you want a full set / hard copies or if we can just insert these revised sheets? Thanks Drew Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Monday, November 13, 2017 10:41 AM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf 1 Drew, Thank You for the information. I don’t necessarily agree with the way you broke out the grading work however it doesn’t make that much of a difference in the end. There is a calculation error on the $6308 * 0.04 = $252.32 not 242.32. This changes the overall amount to be $18,163.44 Please have someone deliver this amount to Priscilla prior to the pre-construction meeting. In addition we will need the remainder of the items listed below: In order to issue the Construction Development permit, we will need the following: 1) Plat submitted for signature 2) Construction Inspection fee calculations based on contract value (see page 3 http://www.coppelltx.gov/Documents/Government/Engineering/Building%20Inspections/ENG- ConstructionDevelopmentFillable.pdf, be sure to include grading costs as that is sometimes omitted from the paving): a. prepared by Engineer of Record b. reviewed by Coppell Staff c. Schedule pre-construction meeting d. paid at or before pre-construction meeting 3) Street Lighting fee of $704.88 paid at or before pre-construction meeting. (3 years worth of operation fee for street lights proposed). 4) Pay Escrow agreement $. 5) Submit full sets of plans for City stamp approval 2 days prior to the pre-construction meeting. City needs 3 full size and one PDf and CAD of all Civil plans. Submit however many your contractor will need as they must have approved set during construction. 6) Hold the pre-construction meeting with Engineer, contractor, subs at our office – At this point we will not be able to hold a pre-con before November 28. 7) Issue the permit at the pre-construction meeting. George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Monday, November 13, 2017 7:34 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf George, Please find the application updated with the excavation costs added. 2 Thank you. Drew Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, November 09, 2017 7:27 AM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf It can be in mis, other or sometimes it is included in the paving. Any grading work associated with the public ROW is considered under the 4% the individual lot grading is under the 2%. George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Thursday, November 9, 2017 7:25 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf Do you consider dirt work public? Do you want it in Misc? The form is not clear in this regard. Thanks George. Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 3 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, November 09, 2017 7:23 AM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf Where is the grading work in the calculations? George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Thursday, November 9, 2017 6:56 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf George, Please find the revised application attached. I have also provided the accepted bids for the project to support the fee calculations. Thank you Drew Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com 4 From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Friday, October 20, 2017 9:15 AM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf Drew, the costing numbers need to be based on actual contract values and not just an estimate. Also, what is the $51650 in private/other? Please revise and resubmit. Thank You, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Thursday, October 19, 2017 6:16 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf George, Please find the stamped construction plans, engineers estimate, and development application attached. Thank you Drew Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com 5 From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, October 19, 2017 1:14 PM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf Drew, In order to issue the Construction Development permit, we will need the following: 1) Plat submitted for signature 2) Construction Inspection fee calculations based on contract value (see page 3 http://www.coppelltx.gov/Documents/Government/Engineering/Building%20Inspections/ENG- ConstructionDevelopmentFillable.pdf, be sure to include grading costs as that is sometimes omitted from the paving): a. prepared by Engineer of Record b. reviewed by Coppell Staff c. Schedule pre-construction meeting d. paid at or before pre-construction meeting 3) Street Lighting fee of $704.88 paid at or before pre-construction meeting. (3 years worth of operation fee for street lights proposed). 4) Pay Escrow agreement $. 5) Submit full sets of plans for City stamp approval 2 days prior to the pre-construction meeting. City needs 3 full size and one PDf and CAD of all Civil plans. Submit however many your contractor will need as they must have approved set during construction. 6) Hold the pre-construction meeting with Engineer, contractor, subs at our office 7) Issue the permit at the pre-construction meeting. Thank You, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Thursday, October 19, 2017 12:39 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf 6 George, We are updating ASAP and will get it back to you today. How soon can we get permit issued? Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, October 19, 2017 11:05 AM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf Drew, The only revision we are asking for is to show to replace all the alley pavement where the water and sewer lines are shown. Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Drew Donosky \[mailto:drew@claymooreeng.com\] Sent: Monday, October 2, 2017 5:55 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov> Subject: RE: 2017-09-12 Petterson Addition Civils_v3.pdf George, Please find our revised plans attached. 7 Thank you Drew Drew Donosky, PE (TX) 1903 Central Drive Suite #406 Bedford, Texas 76021 Direct: 817.458.4008 Phone: 817.281.0572 Website: www.claymooreeng.com Drew@ClayMooreeng.com From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Friday, September 22, 2017 2:19 PM To: Drew Donosky <drew@claymooreeng.com> Cc: Priscilla Martinez <PMartinez@coppelltx.gov>; Scott Latta <SLatta@coppelltx.gov> Subject: 2017-09-12 Petterson Addition Civils_v3.pdf Drew, Please find attached the review for your subdivision. If you have any questions, please feel free to contact me. I would be glad to sit down and go over the comments for further clarification. Thank You, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov 8