Freeport NIP(2.3)-CS 96050185/81/1996 15:25
84?6546698
84763466~
QUILL CORP
PAGE
100 $chelter Road
Lincolnshire~ IL 60069
847/821 2320
1996
#itt
Jim:
A~ we discussed on the phone yesterday,
all~lng the construction of our distribution center for Quill
C~ration in Coppell to oontinue. As ! described, engineering
~i~w has uncovered concerns with the storm sewer system that
~lets at the site. we will work with you to assure that a
~aally agreeable, comprehensive,
..... and cost effective solution
~~ z~nd.__~ile ~e a~ working to fo~ula~ ~hat plan,
uo ~eep =ne consnruo=lon prooe~s moving. Can you issue
enqineering pe~t with the sto~ sewer qualified allowing us
the other utility work, which ~s not in
~itio~ally, could we ~gin foundation work?
_. I lo~k.forward to your anticipated held with this critical
uu ii
is committed to being a good-citizen in the ~[~
.~i~gell as we have demonstrated in the other towns we call
erring