Loading...
Freeport NIP(2.3)-CS 960419The City With A Beautiful Future April 19, 1996 P.O. Box 478 Coppell, Texas 75019 214-462-0O22 Mayse & Associates Mike Mayse 14850 Quorum Drive Suite 20 Dallas, Texas 75240 RE: Ouill - 400 Royal Lane Development Fee Assessment Dear Mr Mayse: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Oui!l. Please make payment to the City of Coppell in the amount of $58.671.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this. project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Per Birdsall, Street Division Rick Wieland, Parks Development Coordinator CITY OF COPP~LL DEVELOPM~-NT FEES Date: Project: April 19, 1996 Oafill - 440 Royal Lane TOTAL AMOUNT DUE FEES D~ PRIOR TO COUNCIL Water Ira?act Fee $8,325.00 8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 100.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Pzrmit) Water Meter Fee (Domestic) 195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 30.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 5,357.78 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50 % due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow 46,746.00 46,746.00 (100% due prior to Council Approval) Construction lnsl~'tion Fee need submittal of (2 % of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $64,489.76 $58,671.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot bo assessed until afizr TU Electric submits the lighting plan for the proposed project. Chaco the plan is submittod, $292.60 per light will bo assessed. COPPELL ENGINEERING TO: PIK~I: April i0, 1996 Mike Martin, Assistant city Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for Ouill-440 Royal Lane The following fees should be assessed and collected on the above referenced project. Water Impact Fee: ~" Domestic Meter/s = ~ ESU's 2" Irrigation Meter/s = ~ ESU's 8" Fireline Meter/s = 2.5 ESU's Total 18.5 ESU's @ $450.00 ea = $~.325.00 100% due prior to Council approval of the final plat. WastewaterImpact 1 - $" Domestic Meter/s = ~ ESU's Total ~ ESU's @ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $50.00 each = $100.00 100% due prior to issuanoe of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee ~ Connections @ $50.00 each = $$0.00 100% due prior to issuance of building permit. (RE-INSPECTIONSFOR WATER OR WASTBWATER $30.00) (Residential only) Developlent Fees Page 2 Utility Final Inspect/on Fee (Ail Development) 1 lots ~ 5 50.00/lot = 550.00 100% due prior to issuance of building permit. Water Meter Fee (Dolestic) ~ - 2" Domestic Meters @ $395.98 = 5195.98 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 2" Irrigation Meter/s ~ $ 195.98ea ~ - 8" Fireline meter/s ~ $2.580.90ea = = ~195.98 $S, 61.8o Total 55.$57.78 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Falily or Non-Residential) 1 Meters @ S$0.00 ea = $$Q.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ 535.00 ea = 555.00 100% due prior to issuance of water meters. devfees EScRoW'~/ROADWAY IMPACT FEE cALCULATIONS PROJECT: DATE: Freeport North, Replat of Lot 3C & a portion of Lot 5R (Quill) 4/12196 ROADWAY IMPACT FEE: Service Area * 4 Cate~;ory ** Industrial Land Use ** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee Der Vehicle Mile Roadway Impact Fee due = (Development Units) x (Vehicle Miles Der Development Unit) x ~Fee Der Vehicle Mile) = General Li~at Industrial 147,000 147 $300 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)