Freeport NIP(2.3)-CS 960410 CITY OF COPPELL ,,.~
DEVELO~ FEF.~
~)ate: April 10, 1996
Project: (~,m - 440 Royal
TOTAL AMOUNT DUE
FEES D~ PRIOR TO
COUNCIL
Water Impact Fee $8,325.00 8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 100.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 3,600.00 3,600.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 50.00
(100~ due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 30.00
(100~ due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 5,357.78
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00
(100~ due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2 % of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $17,743.76 $11,925.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* Thisfeecann~tbeassessedunti~~fterTUE~ectricsubmitstbe~ightingp~anf~rtbepr~p~sedpr~ject. Once tbe plan
is submit2d, $292.60 per light will be asaessed.
April 10, 1996
Mike Martin, Assistant City Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for Ouill-440 Royal Lane
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - $# Domestic Meter/s = ~ ESU's
~ - 3" Irrigation Meter/s = ~ ESU's
2 - 8" Fireline Meter/s = 2.5 ESU's
Total 18.5 ESU's @ $450.00 ea
100% due prior to Council approval of the final plat.
WastewaterIipact
1 - 2" Domestic Meter/s = ~ ESU's
Total 8 ESU's @ $450.00 ea = S3.600.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $50.00 each = ~
lOO% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
~ Connections @ $50.00 each = $50.00
100% due prior to issuance of building permit.
(RE-1WSP~CTIOHSFOR WATER OR WAST~ATER $30.00)
(Residential only)
D~velo~ent Foos
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $ 50.00/lot = 550.00
100% due prior to issuance of building permit.
Water Water Fee (Domestic)
1 - 2" Domestic Meters @ S195.98 = SI95.98
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - ~" Irrigation Meter/s @ 5 1~5.98ea = 5195.98
2 - 8" Fireline Meter/s @ $2.580.90ea = 55.161.80
Total $$.357.78
100% due prior to issuance of water meter/s.
Water Water Deposit (Multi-Family or Hon-Residential)
~ Meters @ $30.00 ea = 530.00
100% due prior to issuance of water meters.
Irrigation Heter De~o~it
1 Meters @ $35.00 ee = $35.00
100% due prior to issuance of water meters.
devf ees