Loading...
Freeport NIP(2.3)-CS 960410 CITY OF COPPELL ,,.~ DEVELO~ FEF.~ ~)ate: April 10, 1996 Project: (~,m - 440 Royal TOTAL AMOUNT DUE FEES D~ PRIOR TO COUNCIL Water Impact Fee $8,325.00 8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 100.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 (100~ due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 30.00 (100~ due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 5,357.78 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100~ due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2 % of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $17,743.76 $11,925.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * Thisfeecann~tbeassessedunti~~fterTUE~ectricsubmitstbe~ightingp~anf~rtbepr~p~sedpr~ject. Once tbe plan is submit2d, $292.60 per light will be asaessed. April 10, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for Ouill-440 Royal Lane The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - $# Domestic Meter/s = ~ ESU's ~ - 3" Irrigation Meter/s = ~ ESU's 2 - 8" Fireline Meter/s = 2.5 ESU's Total 18.5 ESU's @ $450.00 ea 100% due prior to Council approval of the final plat. WastewaterIipact 1 - 2" Domestic Meter/s = ~ ESU's Total 8 ESU's @ $450.00 ea = S3.600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $50.00 each = ~ lOO% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee ~ Connections @ $50.00 each = $50.00 100% due prior to issuance of building permit. (RE-1WSP~CTIOHSFOR WATER OR WAST~ATER $30.00) (Residential only) D~velo~ent Foos Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $ 50.00/lot = 550.00 100% due prior to issuance of building permit. Water Water Fee (Domestic) 1 - 2" Domestic Meters @ S195.98 = SI95.98 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - ~" Irrigation Meter/s @ 5 1~5.98ea = 5195.98 2 - 8" Fireline Meter/s @ $2.580.90ea = 55.161.80 Total $$.357.78 100% due prior to issuance of water meter/s. Water Water Deposit (Multi-Family or Hon-Residential) ~ Meters @ $30.00 ea = 530.00 100% due prior to issuance of water meters. Irrigation Heter De~o~it 1 Meters @ $35.00 ee = $35.00 100% due prior to issuance of water meters. devf ees