Freeport NIP(2.3)-CS 960307DEVELOPMENT VIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Freeport Nort~ R~__,~_ _ o1' Lot $C and ~ ~ortlon of Lot SR. (~Ouill
Coroorationl to create a Single lot that ~ allow the de~eloptnent of
a 147,000 square foot office/warehouse facility, located on the east
side of Royal Lane, approximately 55' north of the intersection of
Gatoiew Blvd., and Royal Lane, at the request of Rust,
I, icMiter/Jameson.
DRC DATE: February 29, 1996 and March 7, 1996
CONTACt: Ken Griffin, P.E., Assistant City Manager/City Engineer
Site Plan
1. Construct median opening noses per Coppell construction standards 60' minimum
for median opening.
2. Show water and sewer meters and sizes. Also, domestic and irrigation meter should
not be tapped off of the fire line.
3. Water, wastewater and roadway impact fees are required.
Landscape Plan
1. Show the correct visibility easement per the Subdivision Ordinance and then relocate
trees and vegetation greater than 30" high out of the correct visibility sight triangle.
Drainage Plan
1. Where do your drainage systems discharge to? May need offsite easements to grade
to drain. Entire drainage layout will be reviewed when construction plans are
submitted.
2. Show all offsite areas that drain onto this site. You may need to provide public
drainage systems in easements.