Loading...
WA9302-CS 951117 SHIMEK, JACOBS & FINKI,EA CONSULTING ENGINEERS 8333 Douglas Avenue,//820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. November 17, 1995 C. L. SHIMEK, P.E. I. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. Robert Barbarisi, Jr. Natgu ~oration Eleven Teal d 292 Re: City of Coppell, Texas City of Coppell, Village Parkway Ground Storage Res. No.2 Project No. WA-9302 Field Change No. 2 Dear: Mr. Barbarisi The construction plans for the Village Parkway Ground Storage Reservoir No.2 are hereby modified as follows: 1. Revise the flow line of the of the inlet pipe on Sheet No.3 of the construction plans at Station 4+64.36 to elevation 439.5. This change reflects the change issued in Addendum No. 1 dated April 28, 1995. 2. The slope of the inlet pipe between Station 2+15 and Station 4+64.36 will be -0.01%. 3. The center line of the Outlet Pipe Detail on Sheet No.5 is changed to elevation 445.0 to be consistent with the Outlet Profiles on Sheet No.3. The field changes have no effect on the contract price or material quantities and are issued for consistency with previous addendums. Sincerely, Matt Hiekey, E.I.T. ~ cc.' Mr. Larry Davis