Loading...
Freeport NIP(2.3)-CS000531 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Larry ~, Construction Inspector May 31, 2000 Staples (parking lot addition) As of this date, the above mentioned project has been completed and generally meets the City of Coppell construction standards and requirements. This being a private project and having no work in the City's right-of-way or easement(s), no maintenance bonds or record drawings (asbuilts) are required. Completion and satisfaction was confirmed by Building Inspections. "CITY O]: COPPELL ENGINEERING - EXCELLENCE BY DESIGN*'