Freeport NIP(2.3)-CS000531 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Date:
RE:
Larry ~, Construction Inspector
May 31, 2000
Staples (parking lot addition)
As of this date, the above mentioned project has been completed and generally meets
the City of Coppell construction standards and requirements. This being a private
project and having no work in the City's right-of-way or easement(s), no
maintenance bonds or record drawings (asbuilts) are required.
Completion and satisfaction was confirmed by Building Inspections.
"CITY O]: COPPELL ENGINEERING - EXCELLENCE BY DESIGN*'