Loading...
Freeport NIP(2.4)-CS 991214 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Garreth Campbell, Construction lnnpector Larry Davis, Construction Inspector From: Debi Ingram, Engineering Secretary Date: December 14, 1999 RE: Expiring Maintenance Bond(s) The following Maintenance Bond(s) will expire as follows. Parkwest Commerce Center (Paragon 2) 12/24/99 (Larry Davis) Derse Exhibits - Freeport, Lot 5R 12/24/99 (Larry Davis) MEPC III - Freeport North, Lot 1, Block 1 1/12/00 (Larry Davis) Please re-inspect the above mentioned project(s) to see that the public improvements for this project are in satisfactory condition. *'CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"