Loading...
Freeport NIP(2.4)-CS 970530 P.O, Box 478 /~I Coppell, Texas 75019 ~ The City With A Beautiful Future 214-462-0022 ~ May 30, 1997 Mike Mayse Mayse-Kiser & Associates, Inc. 14850 Quorum Dr., Suite 201 Dallas, TX 75240 RE: Freeport North, Lot 5R Replat (Derse Exhibit) Development Fee Assessment Dear Mr Mayse: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $20,320.20 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely,._~ Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Freeport North, Lot 5R Replat (Derse Exhibit) Date: 5/30/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,114.18 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 · (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Park Fee N/A N/A (100% due prior to Council Approval) Roadway Impact Fee $8,395.20 $8,395.20 (100% due prior to Council Approval) Street Light Fee N/A N/A (100% due prior to Acceptance of Project Street Sign Fee N/A N/A (100% due prior to Acceptance of Project Construction Inspection Fee Need submittal of development contracts TOTAL $26,065.36 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $20,3~0.20 D~VELOPMENT FEE WORKSHEI:T PROJECT: Freeport North, Lot 5R Replat (Derse Exhibit) DATE: 5/30/97 Water Impact Fee: Domestic Meter(s): I - 2 inch = 8 ESU's Irrigation Meter(s): I - 2 inch = 8 ESU's = ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. $8,325.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water IVIeter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $195.98 $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ $195.98 $195.98 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $2,459.10 $4,918.20 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. $105.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $§0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $8,395.20 Street Lighting Fees: Assessed for lighting in the City's right-of-way. N/A This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. N/A (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Freeport North Lot 5R Replat (Derse Exhibits) DATE: 5/30/97 ROADWAY IMPACT FEE: Service Area * 4 ',Category ** Industrial ILand Use ** General Light Industrial Building Size (Sq. Ft.) 105,600 Development Units ** 105.6 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x ~(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $33,580.80 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) · *** (Schedule 2, Page 3 - Roadway Impact Fee Study) WITH 75% CREDIT ON ROADWAY IMPACT FEE li:":'.'i.:!'i~!!::: : ;; l:~~:~ ~ ;l ;;l~::~l:~:~::~:l~:l~;l;~;:::l~l~l:l~:~l~;~ll~: l:~;::l:: ~l~l::l:l:;~l: :l~:~ ~~;I I