Loading...
Dallas County-CS171208 (3) Priscilla Martinez From:Marcus Marion Sent:Tuesday, December 12, 2017 8:26 AM To:Priscilla Martinez Subject:Campion Trail - Survey This a correspondence for Campion Trail From: George Marshall Sent: Friday, December 8, 2017 11:11 AM To: Gene Moulden <GMoulden@cityofirving.org> Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>; Kent Collins <KCollins@coppelltx.gov> Subject: RE: Campion Trail - Survey Gene, That sounds good to us. I will want to make sure we are good with the toe protection before it is cost out by the contractor. I’m wondering if a poured in place wall would be a better option in the long run. Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Gene Moulden \[mailto:GMoulden@cityofirving.org\] Sent: Friday, December 8, 2017 10:46 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Campion Trail - Survey George, I talked to Garry Fennell concerning building the trail down in the channel. After reviewing the photos, aerials and what I am proposing, he did not see it as Waters of the US or wetland and felt comfortable in his opinion of it not being an issue. He did suggest the actual toe of the armoring being concrete. I am working toward updating the plan and details (schematically) and getting the area surveyed. Before moving forward, I wanted to see if Coppell would allow this treatment. If you let me know your opinion before I move much further, that would be great. 1 Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: Gene Moulden Sent: Tuesday, December 05, 2017 5:00 PM To: 'George Marshall' Cc: John Elias; Darryl Zbranek; Marcus Marion Subject: RE: Campion Trail - Survey George, I went back out to the site after our meeting and wanted to see if the attached cross section at STA 123+50 would be a possibility. It would keep the existing alignment and dip down into the drainage way. It would use 18” rip-rap for slope protection. It has its pros and cons, but thought it could be considered. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Tuesday, December 05, 2017 4:12 PM To: Gene Moulden Cc: John Elias; Darryl Zbranek; Marcus Marion Subject: Campion Trail - Survey Gene, We would not be able to get you anything before next Friday at the earliest. If you want us to proceed, let me know. Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov 2 3