Dallas County-CS171212
Priscilla Martinez
From:Marcus Marion
Sent:Tuesday, December 12, 2017 8:39 AM
To:Priscilla Martinez
Subject:Campion Trail
Attachments:Concrete Rip Rap Detail_12-11-17.pdf
This is a correspondence to Campion Trail
From: Gene Moulden \[mailto:GMoulden@cityofirving.org\]
Sent: Monday, December 11, 2017 3:21 PM
To: George Marshall <GMarshall@coppelltx.gov>
Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>; Kent Collins <KCollins@coppelltx.gov>
Subject: RE: Campion Trail - Survey
George,
Please see the attached detail for the concrete rip-rap armoring below the trail. I would recommend the stone rip-rap as
initially submitted for the armoring above the trail as I would want to keep the existing trees.
Please review and let me know if you have any questions.
Gene Moulden | Planning Manager
City of Irving |Capital Improvement Program
825 W. Irving Blvd. Irving, TX 75060
P: (972) 721-2719 C: (469) 446-4308
gmoulden@cityofirving.org | CityofIrving.org
From: George Marshall \[mailto:GMarshall@coppelltx.gov\]
Sent: Friday, December 08, 2017 11:11 AM
To: Gene Moulden
Cc: John Elias; Darryl Zbranek; Marcus Marion; Kent Collins
Subject: RE: Campion Trail - Survey
Gene,
That sounds good to us. I will want to make sure we are good with the toe protection before it is cost out by the
contractor. I’m wondering if a poured in place wall would be a better option in the long run.
Thanks, George
1
George S. Marshall, P.E.
Engineering Manager
Engineering & Public Works
City of Coppell, TX
972-304-3562 (office)
www.coppelltx.gov
From: Gene Moulden \[mailto:GMoulden@cityofirving.org\]
Sent: Friday, December 8, 2017 10:46 AM
To: George Marshall <GMarshall@coppelltx.gov>
Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>
Subject: RE: Campion Trail - Survey
George,
I talked to Garry Fennell concerning building the trail down in the channel. After reviewing the photos, aerials and what
I am proposing, he did not see it as Waters of the US or wetland and felt comfortable in his opinion of it not being an
issue. He did suggest the actual toe of the armoring being concrete. I am working toward updating the plan and details
(schematically) and getting the area surveyed. Before moving forward, I wanted to see if Coppell would allow this
treatment.
If you let me know your opinion before I move much further, that would be great.
Gene Moulden | Planning Manager
City of Irving |Capital Improvement Program
825 W. Irving Blvd. Irving, TX 75060
P: (972) 721-2719 C: (469) 446-4308
gmoulden@cityofirving.org | CityofIrving.org
From: Gene Moulden
Sent: Tuesday, December 05, 2017 5:00 PM
To: 'George Marshall'
Cc: John Elias; Darryl Zbranek; Marcus Marion
Subject: RE: Campion Trail - Survey
George,
I went back out to the site after our meeting and wanted to see if the attached cross section at STA 123+50 would be a
possibility.
It would keep the existing alignment and dip down into the drainage way. It would use 18” rip-rap for slope protection.
It has its pros and cons, but thought it could be considered.
Gene Moulden | Planning Manager
City of Irving |Capital Improvement Program
825 W. Irving Blvd. Irving, TX 75060
2
P: (972) 721-2719 C: (469) 446-4308
gmoulden@cityofirving.org | CityofIrving.org
From: George Marshall \[mailto:GMarshall@coppelltx.gov\]
Sent: Tuesday, December 05, 2017 4:12 PM
To: Gene Moulden
Cc: John Elias; Darryl Zbranek; Marcus Marion
Subject: Campion Trail - Survey
Gene,
We would not be able to get you anything before next Friday at the earliest.
If you want us to proceed, let me know.
Thanks, George
George S. Marshall, P.E.
Engineering Manager
Engineering & Public Works
City of Coppell, TX
972-304-3562 (office)
469-964-4731 (cell)
www.coppelltx.gov
3