Tax2014C-CS150312 CITY OF COPPELL NEIGHBORHOOD ALLEY REPLACEMENT PROJECT No.TAX 2014C ADDENDUM No. 1 3/9/2015 Plans and specifications for the Neighborhood Alley Replacement Project for the City of Coppell, Texas on which bids are advertised to be received until 2:00 PM, March 12, 2015, are hereby modified as follows: CLARIFICATIONS: 1. Pay Item #I-8 Construct 7" Reinforced Concrete Sidewalk: updated to reflect 7" (in lieu of 6") sidewalk crossing to match the 7" alley paving. 2. Pay Item#I-9 Construct 6"Concrete Curb: Quantity has been corrected within the specifications to reflect 320 LF of curb. 3. Pay Item#I-10 Adjust Existing Ground Box: The word "Relocate" has been modified to read "Adjust". 4. Pay Item#I-15 Remove and Reconstruct Curb Inlet: Sheets 15A& 18A, Storm Inlet Piping is 18" RCP that will need to be moved 13' LF at each location. Provide and install 13LF of 18" piping and connections in addition to moving the inlet at each location. 5. The Bid Time (Calendar Days) has been modified from 120 days to 200 days with the understanding that no more than 2 alleys will be under any stage of construction at any given time and that no one alley will be under construction for longer than 21 calendar days. 6. Construction staging will be coordinated with the Construction Inspector after award of contract. 7. The City of Coppell standard paving 3" invert profile will apply in lieu of a flat bottom/thickened edge profile. Alley paving thickness is 7". 8. Bidders shall acknowledge receipt of Addendum No. lin the space provided in the Bid Form and on the envelope of their bid. ATTACHMENTS: 1. Root Barrier Detail ,..) VA 'A 2. Updated Bid Summary Sheet rikK I ,� U 3. Updated Unit Price/Pay Item Schedule lJ� 4. Updated Pay Item Descriptions 5. Re-issued Plans Sheets 3, 15, 18 ADDENDUM#1 Bidding Documents DRIP LINE DRIP LINE OF TREE fr, \►lid_ fpx7 41,1. EXTEND ROOBARRIER FT OR *..% ir LENGTH EQUAL TO 1 FT FOR EVERY 1 INCH DIAMETER OF TRUNK OR TO WIDTH OF DRIP UNE, WHICHEVER IS LONGER TO-) - - STREET R.O.W. 0 t,� SIDEWALK - �-PAVEMENT-� • POLYPROPYLENE PLASTIC ROOT BARRIER {DEEP ROOT MODEL UB 48-2, OR EQUAL) OR 2000 P.S.I. CONCRETE W/20 MIL POLYETHYLENE SHEET .1 1+6" ROOT BARRIER SHALL EXTEND THE ENTIRE LENGTH OF THE TREE'S DRIP UNE TREE ROOT BARRIER DETAIL Addendum # 1 T H E C 1 T Y • O F COPPELL X e o BID SUMMARY TOTAL BASE BID Items #I-1 THRU#I-21 $ Total Tangible Personal Property: $ TOTAL TIME BID CALENDAR DAYS NOTE: A TIME BID OF MORE THAN 200 CALENDAR DAYS SHALL BE CONSIDERED NONRESPONSIVE AND WILL BE REJECTED. 1. Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. 2. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price(see Instructions to Bidders). 3. The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. PROPOSAL GUARANTY ➢ A Proposal Guaranty shall be provided in accordance with Item 102.5 of the Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition. SUBMITTED ON Signature: 1-23 Bidding Documents Neighborhood Alley Replacement Project Tax 2014 C UNIT PRICE BID SCHEDULE BASE BID Item Bid No. Quantity Unit Description and Unit Price in Words Unit Price Total Price Mobilization, Complete In Place, I-1 1 LS •--- Dollars and Cents per LUMP SUM Furnish, install, and maintain Project Signs, Complete In Place, 1-2 7 EA Dollars and Cents per EACH Prepare and Implement Traffic Control Plan, Complete In Place, 1-3 1 LS Dollars and Cents per LUMP SUM Prepare and Implement Storm Water Pollution Prevention Plan, Complete In Place, 1-4 1 LS Dollars and Cents per LUMP SUM Sawcut, Remove&Dispose of Concrete(All Thicknesses), Complete In Place 1-5 17000 SY Dollars and Cents per SQUARE YARDS Construct 7" Reinforced Concrete Paving, Complete In Place, 1-6 17000 SY Dollars and Cents per SQUARE YARDS Construct 4" Reinforced Concrete Sidewalk, Complete In Place, 1-7 1300 SF Dollars and Cents per SQUARE FOOT Construct 7" Reinforced Concrete Sidewalk, Complete In Place, 1-8 4000 SF _Dollars and Cents per SQUARE FOOT Construct 6"Concrete Curb Complete In Place, 1-9 320 LF Dollars and Cents per LINEAR FOOT Adjust Existing Ground Box, Complete In Place, 1-10 5 EA Dollars and _Cents per EACH 1-20 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Bid No. Quantity Unit Description and Unit Price in Words Unit Price Total Price Adjust Existing Valve Box to Grade, Complete In Place, I-11 5 EA Dollars and Cents per EACH Adjust Existing Manhole to Grade, Complete In Place, 1-12 4 EA Dollars and Cents per Each Adjust Existing Grate Inlet to Grade, Complete In Place, 1-13 3 EA Dollars and Cents per EACH Remove&Replace Storm Drain Inlet Top& Throat, Complete in Place, 1-14 9 EA Dollars and Cents per EACH Remove and Reconstruct Curb Inlet& 18" RCP, Complete In Place, 1-15 3 EA Dollars and Cents per EACH Install Tree Root Barrier, Complete In Place, 1-16 70 LF Dollars and Cents per LINEAR FOOT Restore Disturbed Area, Complete In Place, 1-17 1 LS Dollars and Cents per LUMP SUM Repair, replace, modify and restore existing irrigation system, Complete In Place, 1-18 1 LS Dollars and Cents per LUMP SUM Remove and Reset Street Sign,Complete In Place, 1-19 5 EA Dollars and Cents per EACH Project Communication,Complete In Place, I-20 1 LS Dollars and Cents per LUMP SUM 1-21 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Bid No. Quantity Unit Description and Unit Price in Words Unit Price Total Price Subgrade Preparation,Complete In Place, 1-21 17000 SY Dollars and Cents per SQUARE YARD 1-22 Bidding Documents 2.1. Pay Item#I-7—Construct 4"Reinforced Concrete Sidewalk and 2.2. Pay Item#I-8—Construct 7"Reinforced Concrete Sidewalk: This work includes construction of concrete sidewalks of the specified thickness at the locations shown in the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications. All concrete used for sidewalk shall be Class "A" concrete with a minimum cement content of 5 sacks per cubic yard and minimum compressive strength of 3,000 psi at 28 days. No fly ash will be permitted. The concrete shall be doweled into the existing sidewalk where appropriate and reinforced in accordance with the City of Coppell Standard Construction Details. The concrete trail shall be reinforced with a minimum of No.3 bars placed on chairs on 18-inch centers in each direction. The cost for furnishing and placing reinforcement is subsidiary to the price bid. No greater than 1 inch of sand level up course will be allowed under the sidewalk. The surface shall be a baker broom finish and shall be cured with a highway white curing compound applied per the manufacturer's recommendations. Joint type and spacing shall be in accordance with city of Coppell standard details, or as directed by the engineer. All construction, sawed, or expansion joints shall be sealed with self-leveling silicone joint sealant. All sidewalk construction shall be in compliance with the Texas Accessibility Act Article 9102 of the Texas Civil Statute as administered by the Texas Department of Licensing and Regulations. Any sidewalk found to be in noncompliance shall be removed and brought to compliance at the Contractor's sole expense. Measurement and payment for reinforced concrete sidewalk work performed and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per square foot(SF)in accordance with NCTCOG Item 305.2,and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 23. Pay Item#I-10—Adjust Existing Ground Box: This work shall include the relocation of ground boxes as shown on the plans, or as directed by the Engineer. Measurement and Payment shall be made on the basis of the bid price per each(EA)and shall be the total compensation for furnishing all labor, materials, and equipment necessary to complete the work. 2.4. Pay Item#I-15—Remove and Reconstruct Curb Inlet and 18"RCP: This work includes the complete removal and replacement of the entire inlet in the location shown in the plans,or as determined by the Engineer,in accordance with the appropriate details and specifications,including City of Coppell Standard Construction Details 6020 and 6030 and NCTCOG Item 702. Concrete used for the construction of inlets shall be Class "A", with a minimum cement content of 5 sacks of cement/cubic yard of concrete,and a 3,000 psi minimum compressive strength when tested at 28 days. All inlets shall be cast in place. As a result of relocation it is anticipated that 13LF of 18"RCP will be required at each location, as well as connections.Price to include furnish&install. Measurement and payment for work performed and materials furnished related to the inlet removal and replacement, as provided herein, shall be made on the basis of the price bid per each(EA) and shall be total compensation for furnishing and/or operating all labor, materials, tools,equipment and other incidentals necessary to complete the work. TAX 2014C - »ogmH2Oo ALLEY REPLACEMENT PROJECT - mm128 .[ , § § ! | , . . . . . . . . § / ° / . . . . . - ) , § pi ■ . k | § § , , , . . , . . , , , . | ( . . . ; §wt.ell , ■ , ■ / , . . _ . M. -} / » . „ . . F \ z ) �( ' \ ` / \ 0§ . , . u o !) % , : : / . . , 0 - ! ! , '! ! , . . ! R. ; , , ; ' ! ! I ? i | . ` i' ) i / / ) ' ! ; . . ; z a.' ; , . E. , ƒ. 064- ( ` ! , . ; \ \\ ` ' ; . ; *O ( . ` � ! , \ • . . « {{ § ; . ,1 . . . ; a ! . ! 1:51 ` . . . . . , _ . §/ | ` . 40 ` | ! . . . , , , . . , . . . 6 . , , , , _ „ 11 ; 1 | � 00!1 ; Sill | | | ! g , pd l| | | ; | ' | . „., |' ` °|`I 11 || ( / } 5S kg" ) ( Ni , | ;/ § § §§ 6 § ! [ \ ! | ! !Ii | ( § ) iWi6 §hi ; § ; ! 1 | 4 , . Wi!6 § ! • ) ) § ! , , . 1 ! § } v ( ( ) ) SSS ' |! | | ! | | | | | | ir ) ) | *1 41 : 7 : ! l = 7TI : 177 = ; 7 : : : ! : 5,I. Airli mo e -- TAX 2O14C — NEIGHBORHOOD ALLEY REPLACEMENT PROJECT — MAPLELEAF LANE A a, ct AH0. Lo W W g� W W Xa4 R2 ' L U U m O O J d '�[ rc P QEt�'N Z Z m m 0 Q 4" $ O 0 0 d o � U U Z d' F N k'" YC Z w 2 3 O Ll a 0 ~ ~ y z € €s a.0‘. Z h [Y O U w O Q CC ap E 0 o o c� d w n ? c� w i g g w v r W w w 0 0 0 2 U� U) - .. o Y J O O Z Z Z Z z Z Z z Ays'� ,. 12 r- ( ( C r � r 0 0 (n >( w Cl) In )< w x o I¢'m Q a aa X X X X X X X X a a w w w w w w w w ds 1,1 ,, W Q Baa a3aw_ o o 0 AVM i1b43�03tl J W W 1.1 Luz Q Q w fLZ 1_ w 0 88 z < LLV ,,,,,"`8,„'E,' y U J - w Ua cr rt act d o o N t. a ® . S - IN NY w - =011. •U ' ii... m -} ter . • yam.mwg O m 1y " „�€ F o 1 W ® o0 Y3'ii1i _ ® _§E€ g9 1 � � ffiSoa s o� 5A k 1:11 1 11 s,1,,., C i Y i !Ilg iL ;,lCAa9A nRis, YS _ Y,. l 6MP'2JIVd3fJ A3-11'd4lOZ/40/60 illtld3d A3T)V a TAX 2014C NEIGHBORHOOD ALLEY REPLACEMENT PROJECT ASPEN WAY DRIVE ALLEY rn w w w w x 0 a � , anew K K O x '8 z 8m lixl d Z Z m O 0 d d �_' 00 m O z0 z z } 0_ ,y0 c_,‹ a e:e! Ill Q - 0 3 z w 2 3 z is ,liEg ] LU o o a ? r J W W C U' U' U' U' U' Z U' _ W N N Z z z z z z z z - Y O O O O 1~/1 (~il N (~il (~i7 l~i1 N (~il pp 0_ 0- X x x X X x X 1 .r Q a a- [1 x L.,>< w w w w w w - j } Dw J W Q y J > U Q CC ET- ICC 1� 0O °] 0 QU {JJ{ Q 0 to cr Z 1 W W O 0 � t t itl a�. �gi;; ttt =; Y ! 3 wwl 2 a � ' 30' tial 14 IA y'� IU o , } L Plill tL'li'l1 ° / l 1 e€ F 1 e f3 li a i 1 ft,,,,, 4 r ^ ' - '4 : Sp :P9g A.11411! e co Q 6MP'LIIVdJ A311V 4LOZ/40/60 2JIVd321 J.3TV