Loading...
Dallas County-CS171220 Priscilla Martinez From:Marcus Marion Sent:Wednesday, December 20, 2017 3:58 PM To:Priscilla Martinez Subject:Campion Trail - Survey This is a correspondence for Campion Trail From: Gene Moulden \[mailto:GMoulden@cityofirving.org\] Sent: Wednesday, December 20, 2017 2:23 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>; Kent Collins <KCollins@coppelltx.gov> Subject: RE: Campion Trail - Survey That is our typical standard. Dallas County was inquiring because it was requiring about 6-8” of fill on the back side, if sloped away it would reduce it to 2-4” of fill. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Wednesday, December 20, 2017 2:15 PM To: Gene Moulden Cc: John Elias; Darryl Zbranek; Marcus Marion; Kent Collins Subject: RE: Campion Trail - Survey I think the 1.5% is appropriate. I would be concerned with sloping it away only because the ROW should slope to the street. But I could be convinced otherwise. George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Gene Moulden \[mailto:GMoulden@cityofirving.org\] Sent: Wednesday, December 20, 2017 2:05 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion 1 <MMarion@coppelltx.gov>; Kent Collins <KCollins@coppelltx.gov> Subject: RE: Campion Trail - Survey George, We can make that adjustment. Once I receive exact grades, I will revise and share the detail. Also, a question has come up concerning the slope of the trail along Belt Line Rd. currently, the plans call for a 1.5% slope toward the road, which would make the back edge of the trail about 4” above the curb. Would you want to keep this cross slope, lessen it or even slope the trail away from the road? Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Monday, December 18, 2017 9:32 AM To: Gene Moulden Cc: John Elias; Darryl Zbranek; Marcus Marion; Kent Collins Subject: Re: Campion Trail - Survey I like the plan with the exception that the toe wall be around 4’ below the flow line. Get Outlook for iOS From: Gene Moulden <GMoulden@cityofirving.org> Sent: Monday, December 11, 2017 3:20:39 PM To: George Marshall Cc: John Elias; Darryl Zbranek; Marcus Marion; Kent Collins Subject: RE: Campion Trail - Survey George, Please see the attached detail for the concrete rip-rap armoring below the trail. I would recommend the stone rip-rap as initially submitted for the armoring above the trail as I would want to keep the existing trees. Please review and let me know if you have any questions. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Friday, December 08, 2017 11:11 AM To: Gene Moulden 2 Cc: John Elias; Darryl Zbranek; Marcus Marion; Kent Collins Subject: RE: Campion Trail - Survey Gene, That sounds good to us. I will want to make sure we are good with the toe protection before it is cost out by the contractor. I’m wondering if a poured in place wall would be a better option in the long run. Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Gene Moulden \[mailto:GMoulden@cityofirving.org\] Sent: Friday, December 8, 2017 10:46 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: John Elias <JElias@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Campion Trail - Survey George, I talked to Garry Fennell concerning building the trail down in the channel. After reviewing the photos, aerials and what I am proposing, he did not see it as Waters of the US or wetland and felt comfortable in his opinion of it not being an issue. He did suggest the actual toe of the armoring being concrete. I am working toward updating the plan and details (schematically) and getting the area surveyed. Before moving forward, I wanted to see if Coppell would allow this treatment. If you let me know your opinion before I move much further, that would be great. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: Gene Moulden Sent: Tuesday, December 05, 2017 5:00 PM To: 'George Marshall' Cc: John Elias; Darryl Zbranek; Marcus Marion Subject: RE: Campion Trail - Survey George, 3 I went back out to the site after our meeting and wanted to see if the attached cross section at STA 123+50 would be a possibility. It would keep the existing alignment and dip down into the drainage way. It would use 18” rip-rap for slope protection. It has its pros and cons, but thought it could be considered. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Tuesday, December 05, 2017 4:12 PM To: Gene Moulden Cc: John Elias; Darryl Zbranek; Marcus Marion Subject: Campion Trail - Survey Gene, We would not be able to get you anything before next Friday at the earliest. If you want us to proceed, let me know. Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov 4