Loading...
WA9302-CS 951113 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E, JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. November 13, 1995 C. L. SHIMEK, P.E. I. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. Robert Barbarisi, Jr. Natgu orporation Wakefield, M~1880-1292 Re: City of Coppell, Village Parkway Ground Storage Res. No.2 Dear: Mr. Barbarisi Since the construction of the floor slab is expected to be completed within one working day, and it appears that 1600 cubic yards will be poured, the City of Coppell has requested that the following items be submitted for review prior to construction of the concrete floor slab of the Village Parkway Ground Storage Reservoir No. 2: I) A written plan that includes the following: · The anticipated date of construction. · Routing of concrete trucks through the City. · Routing of concrete trucks at the project site. · Anticipated number of trucks required and queue location. · Type of local traffic routing and construction warning devices to be used. II) Verification of coordination with: · Coppell Independent School District · Local businesses prior to your anticip H floor slab construction date. , ~//fc.'/Larry Davis