Loading...
Freeport NIP(2.4)-LR 971021 GEO--=CNN~C^_ *.kD [~i I==J [~3 L.I F~ EI~',-I ~.O ~11~ E ~I-A L COh.,~b_T-~ i~-] CONCRETE CYLINDER TEST REPORT Derse Exhibits Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Raymond Construction Company REPORT NO. 75 2775 Villa Creek, Suite 230 REG PROJECT NO. 3544 Dallas, Texas 75234-7419 SAMPLE DATE: 10-21-97 ATTN: Mr. Todd Hanson TECHNICIAN: H. Johnson CONTRACTOR: Raymond Construction Company Location of Sample 1 paving: 40'S, 170'E of SW Bldg. Corner 30/580 2 Paving: 50'8, 100'W of SE Bldg. Corner 110/580 3 Paving: 50'S, 10'E of SE Bldg. Corner 210/580 4 Paving: 50'N, 15'E of NW Bldg. Corner 320~580 5 Paving: 40'N, 20'W of NW Bldg. Corner 400~580 6 Paving: 35'S, 60'w of NW Bldg. Corner 530/580 Design Information 1 Pioneer 9351 3000 2 Pioneer 9351 3000 3 Pioneer 9351 3000 4 Pioneer 9351 3000 5 Pioneer 9351 3000 6 Pioneer 9351 3000 Test Results i!i!i?:i~:~:?,:~,i't:i~:~!.i~.i~:iJ ::?: ?. -;i::; :: ii. ::.i ::i: :: :.:.i ::.:.i :: !::; i:::. ::!-:.ii-:!'Ji :.i :i ~ii~i::..::i.:..::i:J:.i':.tO~!'::C~ai-l :'!'::i C~~i~i:-:?:.:J::: ~r~U~::':gl~fi~t~:: 1 6417 10-28-97 7 120200 4250 6417 11-18-97 28 150180 5320 6417 11-18-97 28 152880 5410 5370 6417 Hold 2 6418 10-28-97 7 117740 4170 6418 11-18-97 28 153280 5420 6418 11-18-97 28 148290 5250 5340 6418 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 ' FAX [214] 350 0019 Test Results 3 6419 10-28-97 7 101210 3580 6419 11-18-97 28 131180 4640 6419 11-18-97 28 134840 4770 4710 6419 Hold 4 6420 10-28-97 7 98970 3500 6420 11-18-97 28 126500 4480 6420 11-18-97 28 129370 4580 4530 6420 Hold 5 6421 10-28-97 7 96520 3420 6421 11-18-97 28 129080 4570 6421 11-18-97 28 129420 4580 4580 6421 Hold 6 6422 10-28-97 7 96800 3430 6422 11-18-97 28 133800 4740 6422 11-18-97 28 130830 4630 4690 6422 Hold Cylinder Data 1 6417 5,00 56 60 5.6 4:30 AM 564852 2 6418 4,50 57 62 5.8 5:50 AM 564869 3 6419 4.50 58 60 6.0 8:00 AM 564895 4 6420 5.00 59 66 6.0 8:50 AM 564909 5 6421 5.00 62 66 5.8 9:40 AM 564921 6 6422 4.00 63 63 5.8 11:00 AM 564935 Distribution: (1) Raymond Construction Company/ Submitted by: Mr. Todd Hanson (1) Mullen & Powell-Technistructures/ REED ENGINEERING GROUP, INC. Mr. Dennis Gant (1) Mayse - Kaiser & Associates/ Original Signed By Mr. Greg Daspit (1) City of Coppell/Mr. Larry Davis Keith E. Atkins (1) City of Coppell/Mr. Lee Stone KENajw