Freeport NIP(2.4)-LR 971030 GECTEC~-N CALAN, D ~ ~ ri U ~
E % '..,' RCN~-:NT~' L
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Derse Exhibits
Royal Lane, North of Bethel Road
Coppell, Texas
REPORTED TO: Raymond Construction Company REPORT NO. 71
2775 Villa Creek, Suite 230 REPORT DATE: 10-30-97
Dallas, Texas 75234-7419 REG PROJECT NO. 3544
ATTN; Mr. Todd Hanson DATE OBSERVED: 10-15-97
TECHNICIAN: L. Johnson
PAGE: 1 of 1
CONTRACTOR: Raymond Construction Company
li~(~;~i~i~i:i~'i.~:~iiil Sheet A1.01, A1.02
~:i~i~:~!~.~:~.~:i!~:i~:~i~:!?i~:!?~i~:.~!.i::.i?:~?:.i:..i!~ 1) Chairs were missing below the reinforcing steel.
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: The Project Superintendent was notified. He said they
were going to back the trucks over the steel and the chairs
would be placed during the concrete placement. No one
from REG will observe the concrete placement.
The noted deviations were reported to: Project Superintendent
X IThe noted deviations were scheduled to be corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents, CRSl, and ACl 315.
Distribution:(1) Raymond Construction Company/ Submitted by:
Mr. Todd Hanson
(1) Mullen & PowelI-Technistructures/ REED ENGINEERING GROUP, INC.
Mr. Dennis Gant
(1) Mayse - Kaiser & Associates/ Original Signed By
Mr. Greg Daspit
(1) City of Coppell/Mr. Larry Davis Ronald F. Reed
(1) City of Coppell/Mr. Lee Stone KEAcav
2424 STUTZ DR · SUITE 400 · DALLAS. TX 75235 · TE_ [214] 3S0 5600 · =~'x [214] 350 0019