Loading...
SS1701-CS171201 Meeting Memorandum No. 2– Construction Progress Meeting Time: 10:00 am to 11:00amPage:1 of 4 Meeting Location: 3509 Liston Ln., Fort Worth TX 76040Date:01 December 2017 Meeting Date: Tuesday, November 28, 2017K/J JobNo.: 1745003*01 Project:Central Regional Wastewater System –Coppell Interceptor Improvements Project Subject: Construction Progress Meeting No. 2 TRA Coppell Interceptor Improvements Persons Attending (sign in sheet attached): Name Company/Org.Phone Email Kathy Fretwell Kennedy/Jenks817-733-0488KathyFretwell@kennedyjenks.com Nicole Conner Kennedy/Jenks469-621-6231NicoleConner@kennedyjenks.com Glen Celerier TRA-CMS 817-247-8158 celerierg@trinityra.org Pete Stahl SJL 817-313-3672 petes@sjlouis.com Steven Hodges SJL 817-823-1743 stevenh@sjlouis.com Darryl Zbranek City of Coppell 469-507-9095 dzranek@coppelltx.gov Marco Rameriez TRA – P&D 817-493-5100 ramirezm@trinityra.org Kelly Logsdon TRA-CMS 817-366-9405 Kelly@trinityra.org M Orbeck TRA-CSG 214-876-1517orbeckm@trinityra.org y Carrolton 972-466-3183mike.mckay@cityofcarrolton.com Mike McKa Carlos Ramos TRA -CMS 817-312-6085ramosc@trinityra.org Sammy Pace SJL 512-364-1292 sammyp@sjlouis.com Site Condition/Observation(s) - Summary of work completed for the previous month: ItemResponsible Status Discussion Number 1-1 SJL Open 10/24 Ground survey, control point survey, potholing, manhole survey has been performed (draft was provided as handout in meeting). Manholes survey revealed elevation discrepancies to be resolved. Information to be submitted via ProjectMates (PM) for review. 11/28 Survey issues were discussed in call with engineer, and will be resubmitted. Insituform to clean and reshoot manholes for CIPP. Status of overall project schedule: ItemResponsible Status Discussion Number 1-2 SJL Open 10/24 Preliminary schedule was uploaded by SJL to PM for review in wrong location. To be uploaded to PM as a submittal for review and comment. Comments voiced at meeting included need for schedule to show critical path. Schedule should cross reference with the pay schedule, submittals schedule, and schedule of values. 11/28 The revised Preliminary Schedule review is being finalized and comments will be incorporated into the final Schedule prior to submittal. Per contract documents a meeting will be held with SJL, TRA and K/J to review preliminary schedule comments and final schedule prior to submittal. 1-3 SJL Open 10/24 Complete Schedule should be uploaded to PM as a submittal once the preliminary schedule has been reviewed and any comments addressed. Note Complete schedule is due 60 days from NTP and electronic copy of schedule should be provided with submittal. p:\\2017\\1745003_00 tra coppell interceptor\\13-constfieldwork\\13.39-meetings\\meeting no. 2 11.28.2017\\no. 2 memo tra coppell interceptor 11.28.17.doc © 2005 Kennedy/Jenks Consultants(F-9) Meeting Memorandum No. 2 Construction Progress Update TRA Coppell Interceptor Improvements Meeting Date: November 28, 2017 Page 2 of 4 Contractors’ detailed schedule for the next month: ItemResponsible Status Discussion Number 1-4 n/a Closed 10/24 SJL Provided a schedule for the upcoming month. Noted this schedule may change based on changes to overall schedule. 11/28 SJL was reminded the 30-day look ahead should be submitted a minimum of 24-hours in advance of the monthly progress meetings. SJL intends to install 60” plugs and fence in the next month. Anticipated delivery dates for materials and/or equipment: ItemResponsible Status Discussion Number 1-5 SJL Open 10/24 SJL anticipates delivery of materials within three weeks, pending approval of the material submittals which need to be submitted via PM for review. SJL should upload submittals to PM as soon as possible. 11/28 Material delivery is on hold pending survey. Coordination with the Owner (Testing/Issues/Schedules/Shut-Outs:. ItemResponsible Status Discussion Number 1-6 n/a Closed SJL has been in discussions with TRA Operations and Inspection staff to facilitate information gathering and coordination 2-1 SJL/TRA/KJ Open 11/28 SJL to install 33-inch plug at STA 1+00 early am on 12/1. SJL to coordinate approvals with TRA and K/J prior to installation. SJL was reminded time critical items are requested with sufficient lead time to coordinate review and any necessary alterations. Contractor notice should also be uploaded to ProjectMates and emailed to the appropriate city representatives. Status of submittals: ItemResponsible Status Discussion Number 1-7 K/J Open 10/24 In future K/J will provide a submittal log generated by PM rather than the K/J format. 11/28 Updated submittal log distributed (attached). 1-8 K/J Closed Update provided on submittals to date and the associated status. Noted K/J has had multiple call with SJL and suppliers to facilitate future material submittals and ensure all information is provided for proper review. 1-9 SJL Open 10/24 K/J indicated a number of pre-submittals (attached) have not yet been provided for review and should be uploaded to PM promptly to comply with contract specified dates and to facilitate the review of related materials submittals. 11/28 SJL has provided a number of the required pre-submittals, these items are in review and resubmittal stages. 1-10 All Closed Discussion was had on the polymer concrete manholes. TRA and KJ stated Specification 03465 is a material based spec and any shop drawing submittals MUST conform to all elements of the specification as provided in the contract documents. Specifications were amended via addendum during bidding to reflect received comments and questions from potential bidders, no additional modifications are planned for this project. p:\\2017\\1745003_00 tra coppell interceptor\\13-constfieldwork\\13.39-meetings\\meeting no. 2 11.28.2017\\no. 2 memo tra coppell interceptor 11.28.17.doc © 2005 Kennedy/Jenks Consultants(F-9) Meeting Memorandum No. 2 Construction Progress Update TRA Coppell Interceptor Improvements Meeting Date: November 28, 2017 Page 3 of 4 1-11 K/J & Open 10/24 Coppell would like to review some of the submittals. Once SJL Coppell submits Submittals Schedule K/J will send to Coppell to indicate which submittals they would like to review. K/J will coordinate with Coppell to review the indicated submittals. 11/28 KJ to provide traffic control submittal to cites and receive comments RFI Status - Information or clarification of the Contract Documents: ItemResponsible Status Discussion Number 1-12 n/a n/a No active RFI’s Proposed modifications to the contract (RFPs/Change Orders): ItemResponsible Status Discussion Number 1-13 n/a n/a No proposed modifications Field observations or potential construction issues: ItemResponsible Status Discussion Number 1-14 All Open 10/4 Reconciliation of potholing and manhole elevation discrepancies will be needed to facilitate construction progress. To be conducted as part of submittal review process. 11/28 Manhole elevation reconciliation is ongoing. SJL to confirm Cypress Waters connection invert. TRA to provide pictures of connection to SJL. Pay Requests: ItemResponsible Status Discussion Number 1-15 n/a n/a No active pay requests. Schedule must be approved prior to pay request. 2-2 SJL/TRA/KJ Open 11/28 Pay estimates due 11/30 to TRA for processing by end of year. SJL to submit app for bonds and insurance based on expected approval of preliminary schedule. Maintenance of quality standards. ItemResponsible Status Discussion Number n/a n/a 1-16 No quality issues raised at this time. As-Built documentation: ItemResponsible Status Discussion Number 1-17 SJL Open 10/24 At future meetings Contractors and inspectors as-builts will be reviewed at the conclusion of the progress meeting. 11/28 Ongoing. Other: ItemResponsible Status Discussion Number th 1-18 n/a Closed Progress meetings will be held on the 4 Tuesday of each month, next meeting Tuesday 28 November 2017 at the Inspection trailer on the project site. 2-3 All Closed Next progress meeting to be held Tuesday 26 December 2017 at 10am, location TBD. SJL to coordinate 09BC1 for same day. 2.4 All Closed Meeting with City of Coppell to be scheduled for 11 December 2017 at 1:30pm, location TBD. p:\\2017\\1745003_00 tra coppell interceptor\\13-constfieldwork\\13.39-meetings\\meeting no. 2 11.28.2017\\no. 2 memo tra coppell interceptor 11.28.17.doc © 2005 Kennedy/Jenks Consultants(F-9) Meeting Memorandum No. 2 Construction Progress Update TRA Coppell Interceptor Improvements Meeting Date: November 28, 2017 Page 4 of 4 2.5 All Closed Meeting with apartment complex to be scheduled for 11 December 2017 at 3pm, location TBD. Distribution: Attendees via ProjectMates Nicole Conner Project 1745003*01 File 7.03 p:\\2017\\1745003_00 tra coppell interceptor\\13-constfieldwork\\13.39-meetings\\meeting no. 2 11.28.2017\\no. 2 memo tra coppell interceptor 11.28.17.doc © 2005 Kennedy/Jenks Consultants(F-9) Submittals (All Items) 27-Nov-2017 06:10 PM CT CRWS Coppell Interceptor Improvements 26Total SubmittalsElm Fork Dr Carrolton, Tx 75006 6CompleteCMS File #: 3136.100 7OutstandingPrime A/E: Kennedy Jenks 11921 No.Ref.Date OriginatedDays Last ActionStatusResponsibilityCSI Classifications No.Elapsed SD-19 27-Nov-20170 day(s)27-Nov-2017 - InitialPendingKathy Fretwell016.00 - Dump Site Agreement (02 - Shop Drawings) SD-18 17-Nov-201710 day(s)17-Nov-2017 - InitialPendingKathy Fretwell015.01 - Preliminary Schedule (02 - Shop Drawings) SD-17 21-Nov-20176 day(s)21-Nov-2017 - InitialPendingKathy Fretwell020.00 - Pre-Con Video (01 - Preconstruction Submittals) 020.00 - Pre-Con Video (01 - Preconstruction Submittals) SD-16 15-Nov-201712 day(s)15-Nov-2017 - InitialPendingKathy FretwellSD-045.00 - Submittal log (02 - Shop Drawings) SD-15 09-Nov-201717 day(s)27-Nov-2017 - CommentNot reviewed (Rejected)SD 15 - Preliminary Schedule (02 - Shop Drawings) SD-14 28-Oct-201723 day(s)21-Nov-2017 - Approval/DisapprovalRevise and Resubmit SD 14 - Polymer Precast Concrete Manholes (02 - (Rejected)Shop Drawings) SD-13 27-Oct-201721 day(s)17-Nov-2017 - Approval/DisapprovalNot Approved (Rejected)D #13 - Tunneling Means and Methods (02 - Shop Drawings) SD- 27-Nov-20170 day(s)27-Nov-2017 - InitialPendingKathy FretwellSD #12 - SWPPP (02 - Shop Drawings) 12.1012.01 - SWPPP Submittal (Revised) NOI (02 - ShopDrawings) SD-12 27-Oct-201721 day(s)17-Nov-2017 - Approval/DisapprovalApproved As Corrected SD #12 - SWPPP (02 - Shop Drawings) (Approved) SD-11 24-Oct-20179 day(s)02-Nov-2017 - CommentRevise and Resubmit SD 11 - Potholing Report (02 - Shop Drawings) (Rejected) SD- 27-Nov-20170 day(s)27-Nov-2017 - InitialPendingKathy FretwellSD 10 - Communication Plan (02 - Shop Drawings) 10.2SD-10.01 - Communication Plan (02 - Shop Drawings) 010.02 - Communication Plan (revised) (01 - PreconstructionSubmittals) SD- 14-Nov-20177 day(s)21-Nov-2017 - Approval/DisapprovalApproved As Corrected SD 10 - Communication Plan (02 - Shop Drawings) 10.1(Approved)SD-10.01 - Communication Plan (02 - Shop Drawings) SD-10 23-Oct-201716 day(s)09-Nov-2017 - Approval/DisapprovalRevise and resubmit SD 10 - Communication Plan (02 - Shop Drawings) (Rejected) SD-9 26-Sep-201715 day(s)12-Oct-2017 - Approval/DisapprovalApproved As Corrected SD 09 - CIPP (02 - Shop Drawings) (Approved) SD-8 01-Sep-201717 day(s)18-Sep-2017 - Approval/DisapprovalApproved As Corrected SD 08 - Office Trailer (02 - Shop Drawings) (Approved) SD-7.1 26-Sep-201716 day(s)12-Oct-2017 - Approval/DisapprovalRevise and Resubmit SD 07 - 48-Inch Casing (02 - Shop Drawings) (Rejected)SD 07.1 - 48-Inch Casing(02 - Shop Drawings) SD-7 28-Aug-201720 day(s)18-Sep-2017 - Approval/DisapprovalRevise and Resubmit SD 07 - 48-Inch Casing (02 - Shop Drawings) (Rejected) SD-6 23-Aug-201725 day(s)18-Sep-2017 - CommentRevise and Resubmit SD 06 - Fiberglass Manholes (02 - Shop Drawings) (Rejected) SD-5.1 20-Oct-201717 day(s)07-Nov-2017 - Approval/DisapprovalApproved As Corrected SD 05 - 60-Inch Casing (02 - Shop Drawings) (Approved)SD 5.1 - 60-Inch Casing(02 - Shop Drawings) SD-5 21-Aug-201734 day(s)25-Sep-2017 - CommentRevise and Resubmit SD 05 - 60-Inch Casing (02 - Shop Drawings) (Rejected) 1 of 2 Printed from Projectmates Project Management System11/27/2017 Submittals (All Items) 27-Nov-2017 06:10 PM CT CRWS Coppell Interceptor Improvements 26Total SubmittalsElm Fork Dr Carrolton, Tx 75006 6CompleteCMS File #: 3136.100 7OutstandingPrime A/E: Kennedy Jenks 11921 No.Ref.Date OriginatedDays Last ActionStatusResponsibilityCSI Classifications No.Elapsed SD-4.1 27-Oct-201731 day(s)27-Oct-2017 - InitialOverdueCody SearsSD #4.1 - Schedule of Values (02 - Shop Drawings) SD-004 - Schedule of Values (01 - Preconstruction Submittals) SD-4 18-Jul-201761 day(s)18-Sep-2017 - CommentRevise and Resubmit SD-004 - Schedule of Values (01 - Preconstruction (Rejected)Submittals) SD-3 18-Jul-201761 day(s)18-Sep-2017 - CommentRevise and Resubmit D-003 - Flowtite Pipe Data (FRP) (03 - Product (Rejected)Data) SD-2.1 22-Nov-20175 day(s)27-Nov-2017 - CommentPendingKathy Fretwell312316.13 - Trenching (01 - Preconstruction Submittals) SD 002.1 - Trench Safety Plan (Revised) (02 - ShopDrawings) SD-2 03-Jul-201776 day(s)18-Sep-2017 - CommentApproved As Corrected 312316.13 - Trenching (01 - Preconstruction (Approved)Submittals) SD-1 03-Jul-201776 day(s)18-Sep-2017 - CommentRevise and Resubmit 331113 - Public Water Utility Distribution Piping (02 - (Rejected)Shop Drawings) 2 of 2 Printed from Projectmates Project Management System11/27/2017