Loading...
2014_0213 (13)CIIECK ONE: IRRIGATION DOMESTIC FIRELINE Y BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # Or\ ` NEE' M LOCATION OF SERVICE: � OQ 5�)A M"\C �V�k u c Cn w(- ` Tx 7 5 p I q The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable par=eters. TYPE OF ASSEMBLY C Reduced Pressure Principle ❑ Pressure Vacuum Breaker 9( Double Check Valve o Atmosphere Vacuum Breaker Manufacturer �E�C Size j ' f Model Number 905 y Located At 1�-- Serial Number V3 K W O� The above is certified to. be true. Firm Name 7A �\\ Firm Address G q C a: ,c 5i" ?5,,),-�)7 Gauge # ��317 `5 9 Date last accuracy tested Certified rester M\ 0-\c�.�t Ceri. Testa No Date White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight a/ � Dsid Leaked o Closed Tight Leaked 0 0 Opened at psid Opened at _� sid Did not Open o Dsid Leaked o Reps and Materials Used Test After DC- Closed Closed Tight o Opened at Opened at nsid Repair Tight n nsid Dsid RP sid The above is certified to. be true. Firm Name 7A �\\ Firm Address G q C a: ,c 5i" ?5,,),-�)7 Gauge # ��317 `5 9 Date last accuracy tested Certified rester M\ 0-\c�.�t Ceri. Testa No Date White - Customer's Copy Yellow - City Copy Pink - Tester's Copy