SS1701-CS171204 (2)
Shop Drawing/Submittal Review Letter (SDRL) 777 Main Street, Suite 600 Fort Worth, TX 76102 817-887-8051 www.KennedyJenks.com T O:S.J. Louis Construction Page:1 of 1 th 520 S. 6 Avenue K/J Job No.: 1745003.00 Mansfield, Texas 76063 Project Name: TRA Coppell Interceptor Submittal Reference: SD-010.2 Drawing Reference: A TTENTION:Steven Hodges, Project Coordinator Specification Section: 01040 Pete Stahl, Project Manager Response Date: 12/04/17 A.The action(s) noted below have been taken on the enclosed drawing(s). APPROVED = Submittal is found to be REVISE AND RESUBMIT = Submittal has deviations from the Contract Documents, significant errors, or is inadequate and must acceptable as submitted. be revised and resubmitted for subsequent review. APPROVED AS CORRECTED = Submittal is NOT APPROVED = Products are not acceptable acceptable with corrections marked by Contractor or notations made by Engineer and may be used as corrected. Refer to Manufacturer or Item K/J Action Comments SupplierTitle of Submittal / Drawing 1APPROVED 1-4 SJL SD-010.2Communication Plan Comment(s): 1. Additional information is requested on how is SJL addressing specific notification requirements from the site certifications and how will SJL document the special notices provided to those utilities? This information will be considered supplemental information for documentation only. 2. Please note development and use of the communication plan for the project area extending from Station 111+00 to Station 140+56.87, does not absolve Contractor from notification requirements as outlined in the site certificates for all properties along the construction alignment. Contractor must notify all property owners, easement holders, and utilities as dictated by the site certificate agreements. 3. Please note as per Section 1.07.E. of Specification 01040, “Progress reports shall be delivered on Fridays by 3:00 PM (or more frequently if required) and left on the door of each adjacent property. Additionally, a copy of the update memo shall be emailed to the Engineer, TRA Construction Services Inspector, City of Coppell Engineer, City of Coppell Inspector and any other email distribution list determined at the beginning of the project.” 4. Please note as per Section 1.07.E. of Specification 01040, “In addition to notification of the public, the contractor shall coordinate with trash collection services to allow for access to trash collection.” ISTRIBUTION S UBMITTAL R ESPONSE. D TRA PM Glenn Celerier x x Contractor (SJL) PM Pete Stahl x x Contractor (SJL) Coord. Steven Hodges x x TRA Const. Inspector Jesse Reed x x File (15.0) x x By: Nicole Conner, P.E. p:\\2017\\1745003_00 tra coppell interceptor\\15-submittals\\in review\\completed_word files\\sd-010.2 communication plan.doc © 2006 Kennedy/Jenks Consultants Inc. \[F-2\]