Loading...
SS1701-CS171130 Shop Drawing/Submittal Review Letter (SDRL) 777 Main Street, Suite 600 Fort Worth, TX 76102 817-887-8051 www.KennedyJenks.com T O:S.J. Louis Construction Page:1 of 1 th 520 S. 6 Avenue K/J Job No.: 1745003.00 Mansfield, Texas 76063 Project Name: TRA Coppell Interceptor Submittal Reference: SD-022 Drawing Reference: CP-01 A TTENTION:Steven Hodges, Project Coordinator Specification Section: 02530 Pete Stahl, Project Manager Response Date: 11/30/17 A.The action(s) noted below have been taken on the enclosed drawing(s). APPROVED = Submittal is found to be REVISE AND RESUBMIT = Submittal has deviations from the acceptable as submitted. Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. APPROVED AS CORRECTED = Submittal is NOT APPROVED = Products are not acceptable acceptable with corrections marked by Contractor or notations made by Engineer and may be used as corrected. K/JRefer to Manufacturer or Item Action Comments SupplierTitle of Submittal / Drawing 1APPROVED 1 SJLSD-022Plug Use Plan Comment(s): No Comments D ISTRIBUTION S UBMITTAL R ESPONSE. TRA PM Glenn Celerier x x Contractor (SJL) PM Pete Stahl x x Contractor (SJL) Coord. Steven Hodges x x TRA Const. Inspector Jesse Reed x x File (15.0) x x Kathy Fretwell, P.E. p:\\2017\\1745003_00 tra coppell interceptor\\15-submittals\\in review\\sd-022 plug use plan.doc © 2006 Kennedy/Jenks Consultants Inc. \[F-2\]