SS1701-CS170914 TRINITY RIVER AUTHORITY OF TEXAS CENTRAL REGIONAL WASTEWATER SYSTEM COPPELL INTERCEPTOR IMPROVEMENTS PRE-CONSTRUCTION MEETING AGENDA General Office West Conference Room 5300 South Collins, Arlington, Texas 76018 10:00 a.m. September 14, 2107 1. Sign-In and Introductions a. Owner Jesse Reed Construction Inspector * //Plain t?oavf Of" CanEAc/- Telephone — 817.366.8189 Email - reedj@trinityra.org Kelly Logsdon, Construction Inspector Supervisor Telephone - (817) 366-9405 Email - KellyL@trinityra.org Glenn Celerier, P.E., Sr. Construction Project Manager Telephone — 214-247-8158 Email — celerierg@trinityra.org Marco Ramirez, P.E., Planning and Development Engineer Telephone - (817) 493-5104 Email - ramirezm@trinityra.org Sharon Gattis, Construction Accounting Clerk Telephone - (817) 493-5150 Email - gattiss@trinityra.org Vanassa Joseph, Communications Manager TRA Landrights TRA Operations -- Pis' b. Design Engineer — 44 c. Contractor Le S��() %J 1 v\I c se,,y G'lors sept,r�a..�c d. Customer City(ies) /-Lek. e. Other Guests c17.E 1 2. Project Introdu tion (Engineer) tJIII!h U2;(}4- (4)/A ef.,(6 4- Saki Crl--7 ✓cc,4? Page 1 of 8 8/8/2017 3:27:58 PM 3. Insurance and Bonds. ,fin C GJt6 4. Payment Requests, See General Conditions Article 14 and Specification 01130 k - 14009 5. Texas Public Information Act 6. Site Certificates (Land Rights) a. Site Certificate Expiration Dates b. Potential Property Owner Conflicts c. Special or Unusual Conditions Page 2 of 8 8/8/2017 3:27:58 PM 7. ProjectMates (See Section 01039, "Internet Based Construction Management") �'frgenvr�/ 8. Project Communication a. First Point of Contact Is the Inspector b. Communication With Property Owners c. Communication with Carrolton and Coppell 0( 0( 0 9 )6 C .j CL{ -.- d. Email and Correspondence Se— e. Periodic Progress Meetings (Section 01040, "Project Administration," Page 3.) CSd- 2 (i Pi, f. Additional Meetings g. Preconstruction Notifications Page 3 of 8 8/8/2017 3:27:58 PM 9. Record Drawings and Specifications at the Job Site (See General Conditions 00700 Paragraph 6.09) 10. Request for Information (RFI's) See Section 0104, "Project Administration," page 4 11. Contractor's General Responsibilities and Obligations (General Conditions Article 4) a. Superintendence b. Temporary Facilities c. Safety C 1u-(9 5 e`cA- Pry" 6701` -) (04-1•P-94- Page 4 of 8 8/8/2017 3:27:58 PM 12. Contract Modifications a. Contractor's Modification Request (CMR) See Section 01040, "Project Administration," page 4. b. Owner Initiated Modifications (PCM and Field Orders) 44, e c. Procedures for Claims for Increase in the Contract Sum, See General Conditions, Paragraph 11.04 d. Differing Site Conditions (See General Conditions 11.05) 13. Security. tvet.eL 14. Existing Utilities (01040, Project Administration, para. 1.12). Page 5 of 8 8/8/2017 3:27:58 PM 15. Owner's Field Offices, See Section 01521 16. Submittal Reviews and Deliverables Required Prior to Starting Construction a. Certification of submittal. \t/v- b. Scheduling Requirements c. Construction Sequence Y Page 6 of 8 8/8/2017 3:27:58 PM d. Schedule of Values e. Bypass Plan f. Schedule of Estimated Payments g. Submittals Schedule h. Traffic Control Plan i. Communication Plan j. List of The Proposed Subcontractors and Major Materials Suppliers with Historically Underutilized Businesses Noted k. Environmental Protection Plan and Storm Water Pollution Prevention Plan (SWPPP) I. CCTV Inspection m. Pre-Construction Video and Photos n. Pre-Construction Survey and Potholing Report SVLS ? Page 7 of 8 8/8/2017 3:27:58 PM o. Other 17. Open Discussion for Questions and Comments from Participants. Page 8of8 8/8/2017 3:27:58 PM