Water Intrusion Investigation Report TREINCO *wt.; ROOMS&BURMA MANTENANCE Jason M.Hanlin jhanlin@tremcoinc.com Field Advisor 214.636.0233 January 14,2016 Mrs. Sheri Moino City of Coppell—Facilities Management 265 Parkway Blvd Coppell,TX 75019 Re: City of Coppell 265 Parkway water intrusion investigation report .r . ria----1) a iir 41110 1111111111 40 1' iiit :44IAW. 1 ' 1 "At dr iii 4' ..r v T HcômiI co TY 1 ■ TREIICO o ROOFING&BUILDING MAINTENANCE We removed a brick at the bottom of the wall to verify the existence of a brick ledge. .M1S. x i � y rr. 11,1 4 11111. IIII 1 s y, F � k 4.14 Waterproofing Membrane Wood Stud Brick Ledge We found that there is a brick ledge,however the waterproofing membrane is cut short. In ` our opinion the waterproofing membrane should extend to the outside edge of the slab. , r • } _ ; t .. {. CI ROOFING& BUILDING MAINTENANCE 10111111t111 The mortar has voids that allow water entry \' • , .,. .-„- k. ,, w • • ' • 4 • air TRENCO ilp, wti We accessed this column through a interior wall panel 1 , in a conference room. The waterproofing and insulation appear to have been cut out. } NOTE:The columns are hollow. There is no brick tie ' back at the columns. �� ' TM V1/441 ., j t t' ^4o- . -, +i X7]7/ _t '417 , .' We removed brick at the corner column to find i'r */ a it full of sand,mortar,brick and debris. In -, :' fr effect there is no brick ledge. It is filled with a3 3 W + g, debris. Water entering through the cap stone k , L and/or voids in the mortar will flow right in at -; - , . the ground level. .tx T ' *VIM ROOFING& BUILDING MAINTENANCE We removed the EFIS and a section of brick above one window to see the existing .- ., construction. There is no`true'flashing detail above the window. No end dam detail. The waterproofing membrane is set behind the window system. g;, ., '.-, , In our opinion the waterproofing membrane ,a y should have been place on top of the window ' frame. In a manner that would force water . infiltration back out. Also there should be an end dam detail. i ' j 4 A yµ ,,i* • • 7REffice otwti &01,114&111111.0114 .x We removed brick at the bottom of the window to inspect the existing construction. There is no through wall flashing or weep system built into this window system. .. ... g _ `°•�hili. �.a ti" �� - 04 .; .. rrr.r gin/CO ROOFING& BUILDING MAINTEIIAI10E We removed a section of metal coping to inspect the existing construction. The is no waterproofing membrane under the metal coping. Neither on top of the wood nailer or under it. There is evidence 41411 of water entry on the wood nailer. 64414' �'� "a„ _.. .. ash.-'—'•,.,•...- 15a x rr .10 TREMCO ■ &BUILD/lIL"hIPOITEPIAtiCE . ' There is a point for water entry at the bed joint of the cap stone. arm There is a gap between the brick and the wood ¢' nailer. YF IL CONCLUSION: In our opinion, a Ajf waterproofing membrane needs to be install under all metal coping and precast capstones. Voids in the brick mortar need to be fill and the brick needs a penetrating sealer applied. New t flashing details need to be installed around all 11;.1} � windows and the base of the wall at the brick ledge.