Spectrum-PT180201A copy of the approved permit must be on the job site at all times.
CC: Applicant
Public Works
Permit File
Orig. to Project File
T
H g G
T Y O I
COFFEL,L
A 6 1
Page 1 of 4
Rev. 06/2012
RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days fi-om date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 1-25-18 Applicant's Job ## / Work Order ## 1573248
PERMIT FEE: $100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes is No (,
❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
Project Name/Location or address YKK AP America 346 E Beltline Rd
General Contractor GTI Contact# 972-329-9933
E-mail address to return permit mike@gardnerloo . com
Representative: Robert Houston
Franchise ;Telephone#: 469-744-9794
company.
E-mail address: Robert. Hous ton@charter . com
(for contact if needed/if e-mail of approved permit is desired/permit cannot be e-malled unless complete)
Utility Company Represented:
(, Oncor Electric Delivery (' Atmos Energy (, Verizon (' SBC/ AT&T
C Time Warner Cable (' CoSery Electric/Gas t^ Other Spectrum
GeneraFDescription of Work,(ln accordance with Ord. No. 2661-944):PLEASE ATTACH; PLAN OF PROPOSED WORK
1`span overlash,963' of new underground,i4 conduit
Estimated Start Date 1-31 ' - 18 Estimated Completion Date* 2 - 31-18
* Completion requies submittal of Completion Verification Notice (see page 4)
➢Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason: (* Yes C No
➢Is removal of existing streets, alleys, or sidewalks necessary? (' Yes r No
if YES, project must have City inspection prior to concrete replacement
Right-of-Wav Use Permit Application Page 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
➢Attach barricade plan / trench safety plan if a lane or street closure is required.
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City
Engineer.
yAttach Work Order (franchise only) and/or 1 set of prints showing proposed work.
Locates for existing. franchise utilities must be.l. done 48 hours prior to beginning work.
For City utility locates, call 972-462-5166 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to englneer(&coppelltx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
Robert Houston 1-25-18
Signature of Utility Company Representative Date
Mike Hulvey
Signature of Contractor Representative
- 6- �_ _22�t�_
Signature of City Representative
Comments
1-25-18
Date
zo) ZC) Ig
Date
➢NOTE: Nogfy.Cily .Inspector at 972-304-3679 prior to beginnik and prior to
backfill for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claint, dentand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
perntit is granted.
T H 9 . C I r r ., C P Page 3 of 4
COPPELL
A . l
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3,.Proper erosion control measures must be taken.
AFollow Texas MUTCD standards for work in traffic zones.
5,Sod is to be replaced when necessary.
¢,,Irrigation repairs must be performed in a timely manner.
ZFollow OSHA recommended trench safety at all times.
$,Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS
manholes.
IDensities may be required in trench lines (ASTM).
aCare and repair of street signage is the responsibility of the contractor.
<1 No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m.
J Prior notice of work activity on weekends and holidays must be in writing.
1LLine locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx.pov/utility-operations-division
972/ 462-5155
CITY OF COPPELL ENGINEERING DEPT.
9721304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE
214/ 320-5455 (Mike Rasmussen)
AT&T LOCAL NETWORK
214/ 215-3031 (Rich Millenman)
COSERV Gas & Electric
940/ 321-7800 x 7624 (Greg Ward)
EXPLORER PIPELINE
918/ 493-5100 (Patrick Nwakoby)
ONCOR Electric Delivery
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS
972/ 318-5277
FEDERAL EMERGENCY MGMT. ADMIN.
940/898-5138
TEXAS COMM. on ENVIRONMENTAL QUALITY
817/ 588-5800
DENTON CO. LEVEE DISTRICT
214/ 352-5118 (Richard Hightower)
Atmos Energy
972/360-4428 (Gary Dickinson)
1 800 DIG TESS for line locates
(344 -8377)
14.Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16. "Clean-up" requires returning work area to pre -project condition or better.
17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
Y H a - C I T V -O F
COPPED L
741
~fix_��.
ex a .:tS
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Page 4 of 4
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name Spectrum
Project Location / Applicant's Work Order # (if applicable)1573248
346 E Beltline Rd
Sub -contractor Company Name ventura
24 hr.Contact Number 214-991-5948
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
•'-Inspected by
of Utilities Maintenance Division on
and found to be acceptable / not acceptable because
Follow-up needed? ( Yes C No
❖Inspected by
Follow-up scheduled for
of Streets Maintenance Division on
and found to be acceptable / not acceptable because
Follow-up needed? r Yes r No Follow-up scheduled for
copy of this completed notice can be provided to the
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Office: 972-304-3679 Fax: 972-304-3570
Submit by E-mail Print Form
YKK AP AMERICA
346 E BELT LINE RD UNIT 600
COPPELL, TX
VICINITY MAP
ufn000,.
GENERAL PROJECT NOTES
1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE
ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED.
2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE.
UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND
LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR
ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT.
THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY
DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE
DRAWINGS OR NOT.
3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE
MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK.
CALL BEFORE YOU DIG
811
IT'S THE LAW
4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND
PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION.
5. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND
SHALL CONFORM TO THE 'TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS
SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE
FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT
AND BARRICADED AT NIGHT.
6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING
EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH
ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
ASPECTS OF WORK RELATED TO EXCAVATION.
7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN
THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT' AND 7.4.5 "QUALITY OF CONCRETE"
AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION - 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE.
B. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT
CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT.
9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED.
10. ALL BACKFILLING WILL. BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95% PROCTOR. THE REQUIRED
DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO
THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE
USED FOR BACKFILL.
CONTACT: DAVID HATTON 972.670.21 13
PREPARED BY: DFW TELECOM, INC.
LEGEND
PROPOSED CONDUIT
XX' BORE'
BORE UNDER CONCRETE
LEASE DUCT
EXISTING SPECTRUM CONDUIT
EXISTING CUSTOMER CONDUIT
PPXPP
L�X'(M1�! OVERHEAD: NEW BUILD
PP gX• PP
SJ�OH�f! OVERHEAD: OVERLASH
TYPICAL UTILITY CROSSING
'j
CONCRETE PARKING CONCRETE PARKING ONCRETE PARKING! CONCRETE PARKING
_24RCP _ _ 24RCP — _ _ _ _ 24RCP — 18RCP_
\ \ 24' FIRE LANE
N d
i
__-- ___ ________________ _
CONCRETE PARKING I I
V CONCRETE PARKING it ,/ I CONCRETE PARKING7
STA. 0+00
N
PLACE U -GUARD RISER PROPOSED2-2 ~
ON EXISTING POLE W
W
BEGIN UNDERGROUND ry
CONSTRUCTION On
______ ------------------ :17 ----------------- _____ _________ _---__-------_-__-_____
I 10w —low —1Ow-- 10 -- 10"W 15lu'W mw 10'1Y —mw --low— w
r h
W _ --RON U2 LIG_ _ �, 24 W —��- _ _ Ll41QW ROW 1
�.ypp r 5n pQ
zaw—zaw--�z4Yl� 24w --24w z+oo z4w z4w— 3+ 2411 BOB 24w-- 4+Y41Y---24w— ILL
POLE N0. 02 —
30�RCP 33'RCP — 33'RCP ]}RCP 33RCP — ]3'RCP 33 Z
— 'RCP
A U
Q
TYPICAL FAVEMENT BORE DETAIL /
r T N ry
DF
I
E BELT LINE RD
BEGIN PROJECT AT
EXISTING POLE (120R.O.W.
O
N TED N N � I
ROW-- _ROW-- - _ROW_- - ROW - - RDW - - ROW
POLE NO 01
ONCOR
05 2+00 2+50 3+00
- 4 EXISTING GRADE AT CL I -
OF PROPOSED CONDUIT !
TRENCH DETAIL 00
NOT TO SCALE -
Y
TRENCH L. ! _
GROUND LINE
II�E'TEi-1 TLILE=ILL=III= - -
"'
CONDUIT
NOTEDPLAN SEPARATION
l0
tr
WARNING TAPE BACKFILL TRENCH -
�+WITH DEBRIS FREE
CUSHION SAND MATERIAL TAMPED_
PLACE CONDUIT(S) TO 98% PROCTOR -IS
AS SPECIFIED
PREPARED BY: ESTIMATED SHEET TOTALS NORTH
D DESCRIPTION QUANTITY DESCRIPTION QUANTITY
PROJECT: YKK AP AMERCIA
qF TRENCH & PLACE CONDUIT 453' PLACE FLUSH MOUNT VAULT
BORE & PLACE CONDUIT 50' PLACE PEDESTALSpectrumoo,
LF BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET ADDRESS: 346 E BELT LINE RD UNIT 600
PULL THROUGH E%ISTING CONDUIT PLACE POWER SUPPLY DITY, STATE: COPPELL, T"
R & R CONCRETE SIDEWALK (SF) PLACE WALL BOX & RISER
DFWT CONTACT: R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER 1 SHEET HORIZONTAL SCALE VERTICAL SCALE JOB NUMBER: DATE:
DAVID HATTON 972.670.2113 AERIAL: OVERLASH 100' OVERHEAD: NEW BUILD 1 OF Z 1"=40' 1"= 10' 1503246 01-31-201$
LEGEND
�IIG� PROPOSED CONDUIT
Xu X' BORE
BORE UNDER CONCRETE
LEASE DUCT
EXISTING SPECTRUM CONDUIT
EXISTING CUSTOMER CONDUIT
PP
OVERHEAD: NEW BUILD
pRE
p XX'
OVERHEAD: OVERIASH
TYPICAL UTILITY CROSSING
TRENCH DETAIL
NOT TO SCALE
CONCRETE PARKING B I CONCRETE PARKING
- 21 C - --------------
-- ---
21'RCP -
YKK AP AMERICA
346 E BELT LINE RD
UNIT 600
CONCRETE PARKING
9+63
CORE DRILL WALL TO
ENTER BUILDING
CONCRETE PARKING
T-24'RCP --24RCP 27'RCP - ---
m
/ 24' FIRE UNE /
m
----------------- -- =_
W /
N CONCRETE PARKING li CONCRETE PARKING ( CONCRETE PARKING CONCRETE PARKING
Lu
N
i
W PROPOSED 1-2"HDPE
Z STA. 5+05
J
PLACE FLUSH MOUNT 3
U " VAULT 24' x 36' x 36" PROPOSED 2-2HDPE u
STA. 6+OS
- - - - - -QPIACE FLUSH MOUNT
—row ----------------- ---- iSrUI'ILIIY ESMT-------
_ _ M VAULT 24" x 36" x 36"
� t low— t8+bo ---Tow—� '-------- I, I
— IN. 7+00--
-RowROAf— nuc— _tow,
s+oD
24'W ---24'W— 24'W ---24w— _ _ uc BID o'w�—_ _
iv zaw _----z4'w -W stow— ---_ -{I-
-- �nw IRow ��tow l
—zaw —
33'ftLP— 33'RCP 33RCP——33'RCP--
E BELT LINE RD -"'RCP 33 -RCP_ _ 2""�2
. (120' R.O.W.) w �33•RCR, —
8 a
05
STA 5+05
PLACE I
VAULT
STA. 8+05
I
I
I
I
i
�3J'RCp
I�Lll--1-- HI' II IILII II–II 6'w – -
I= N1 III !r—j-
CONDUIT
Fl11 CONDUITCONDUIT AS T�-1`NOTED IN PLAN - 24 KIN
NOTED IN PLAN - - --SEPARATION
10WARNING TAPE AS24" MIN -�-� - R4' MIN. - ! --
BACKFILL TRENCH NOTED IN PIAN SEPARATION Li SEPARATION - - - CUSHION SAND -'- WITH DEBRIS FREE -- --
MATERIAL TAMPED
PLACE CONDUIT(S) TO 98% PROCTOR -15 "
AS SPECIFIED
PREPARED BY: ESTIMATED SHEET TOTALS NORTH YKK AP ANERGIA
D DESCRIPTION QUANTITY DESCRIPTION QUANTITY PROJECT:
F TRENCH & PLACE CONDUIT 416' PLACE FLUSH MOUNT VAULT 2
BORE & PLACE CONDUIT 69' PLACE PEDESTAL e c rum ►
L�- O BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET ADDRESS: 346 E BELT LINE RD UNIT 600
PULL THROUGH EXISTING CONDUIT PLACE POWER SUPPLY an, STATE: COPPELL, TX
R & R CONCRETE SIDEWALK (SF) PLACE WALL BOX & RISER
DFN7 CONTACT: R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER n SHEET /T HORIZONTAL SCALE VERTICAL SCALE JOB NUMBER: DATE:
2
DAVID HATTON 972.670.2113 AERIAL: OVERLASH - OVERHEAD: NEW BUILD 2 OF 1"=40' 1"= 10' 1503246 01-31-2018