Rax2014C-150301 URBAN CONSTRUCTION GROUP
Urban Construction Group
.,"."°°°°°1,
4 — A
Current Project Experience
March, 2015
2512 Program Dr.,Suite 109 mail@urbancon.com Phone:972-385-7574
Dallas,Texas 75220 Fax:972-385-7579
"000"1"7-
URBAN CONSTRUCTION GROUP
1) DART System-Wide Signage Improvements
• Owner: Dallas Area Rapid Transit(DART)
• Engineer: Bridge Farmer&Associates
• Contract Amount: $1,437,660.00
• Percent Complete—99%
• Project Closing up
2) DART On — Call Construction Services
Three Years Contract for the Amount of$3,199,000
2.1)DART Transition Stations Concrete Installation through DFW Area
• Engineer: DART Engineering Department
• Contract Amount : $500,000
• Percent Complete—70%
• Schedule Completion Date: April 30,2015
2.2) CROF TPSS Installation
• Engineer: Campos Engineering
• Contract Amount : $215,972.00
• Percent Complete—98%,
• Schedule Completion Date: March31, 2015
2.3) Chill Water Piping Modification
• Engineer: Campos Engineering
• Contract Amount : $199,745.69
• Percent Complete—89%
• Schedule Completion date: Apri115, 2015
2.4)Lancaster Road Guide Way Fence
• Engineer: DAL-Tech Engineering
• Contract Amount : $88,807.19
• Percent Complete—99%
• Schedule Completion Date: March 31, 2015
2512 Program Dr.,Suite 109 mail@urbancon.com Phone:972-385-7574
Dallas,Texas 75220 Fax:972-385-7579
URBAN CONSTRUCTION GROUP
Urban Construction Group
4 — B
Past Project Experience
March, 2015
2512 Program Dr.,Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579
A°11.1#111#7.„ ,
URBAN CONSTRUCTION GROUP
Civil and Construction Services
1) Jefferson Mountain Bridge Rehabilitation:
Y
* +
1 1 :'. .:: _ ..: , ___
t, L;
4,
• Owner : City of Grand Prier
• Architect: Cobb, Fendley&Associates
• Contract Amount: $276,344.00
• Type of construction: Rehabilitation of existing bridge, including; concrete riprap,bridge rail,paving
• Date of completion: May 2012.
2) Intersection Improvements,Inwood Road at Forest Park
A. ., ;,
=w.. , '
• 1 ,, -i ,,,,,, ,„ , N,
• Owner: DART/City of Dallas
• Architect: Bridge Farmer&Associates
• Contract Amount: $420,000.00
• Type of construction: Grading, Demolition work, Concrete Paving, Base, Asphalt Paving.
• Date of completion: September 2012
3) Alley Reconstruction—East Plano
ALLEYt '_tlrAilik. .,
LOSED
• Owner: City of Plano
• Architect: J. Volk Consulting
• Contract Amount: $574,445.00
• Type of construction: Grading, Demolition work, Concrete Paving, Street Inlet.
• Date of completion: November 2013
...
2512 Program Dr., Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579
„„0000#7 URBAN CONSTRUCTION GROUP
0 4) Plano City Wide Trail Construction
; . _ :, 7:1---... --”:
a
r
t
■ •
• Owner : City of Plano
• Architect: JBI Partners
• Contract Amount: $539,646.71
• Type of construction: Demolition, Grading, Concrete Removal and Paving
• Date of completion: May 2014
5) Union Station to Oak Cliff Streetcar TIGER Project
,.
}
.. • - i' _ w
•
vim+
• Owner: Dallas Area Rapid Transit(DART/City of Dallas)
• Architect: Nathan D. Maier Consulting Engineers
• Contract Amount$481,384.20
• Type of construction: Demolition, Grading, Flex Base Installation, Concrete Paving.
• Date of completion: June 2014
2512 Program Dr.,Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579
"""Isi, URBAN CONSTRUCTION GROUP
Construction Management ServieIPs
DART and City of Dallas: Construction Management and Quality Control:
Construction Management and QA/QC for Southside Lamar phase II, $3M
- Task 1: $128, 181.00
- Task 1: Street Improvements.Underground Utilities,Concrete Pavement, Landscape
- NTP-July 2011. Substantial Completion-August 2012
Construction Management and QA/QC for NW Plano Park&Ride Facility Project, $3M
- Task 2: $265, 969.00
- Task 2: Construction of transit related park&ride facility.
- NTP-December 2011. Substantial Completion-August 2012
Construction Management&QA/QC for Live Oak and Keeneland Parkway,$4M
- Task 3: $278,148.00
• Street Improvements. Underground Utilities, Concrete Removal and Installation
- NTP- September 2012. Substantial Completion-July 2013
2512 Program Dr.,Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579
'°/°#7
URBAN CONSTRUCTION GROUP
Urban Construction Group
4 — C
Equipment
March, 2015
2512 Program Dr.,Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579
"fr#1.41".7. 5! URBAN CONSTRUCTION GROUP
1. Earth Work:
• Drop hammer,Stanley DH 3500
• Skid steer - Bobcat T190
• Excavator—Zero swing KOBELCO 235SR LC
• Backhoe Loader—Cat 416F
• Dump Trucks
2. Concrete Work:
• Truss Screed
• Concrete Vibrators
• Concrete Hand Tools
2512 Program Dr.,Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579
URBAN CONSTRUCTION GROUP
Urban Construction Group
,00.-°'
4 — D
Financial
March, 2015
2512 Program Dr.,Suite 109 mail@urbancon.com Phone: 972-385-7574
Dallas,Texas 75220 Fax: 972-385-7579