Loading...
Tax2013B-CS160927 CD BUILDERS, INC, General Contractors September 27, 2016. VIA EMAIL AT jbrieton@coppelltx.gov Jamie Brierton- Project Manager City of Coppell- Engineering & Public Works P.O. Box 9478 Coppell, Texas 75019 la * <i s r CPPELL Project: Reconstruction of Highland Meadow Circle &Edgewood Drive Re: Request of Status of Weather Delays and the consequently inability to obtain supplies,materials and Services. Dear Jamie: I am writing to you as a follow up to our letter dated of July 26, 2016, wherein we submit to The City of Coppell consideration of the adverse impact to the critical path caused by loss of time due to causes beyond the control and without the fault or negligence of CD Builders, including but not restricted to weather conditions and the consequently inability to obtain supplies, materials and services when orders for such supplies and materials were timely made on the above referenced project. Unfortunately, as of this date we have still not received any further news. It is important that this situation is quickly brought to a close in case that we need to provide any other information. CD Builders demonstrated that the weather actually delayed the critical path work on the project. As part of this, the City of Coppell should take into consideration the adverse impact to the critical path caused by loss of time due to causes beyond the control and without the fault or negligence of CD Builders, including but not restricted to: 1- weather conditions and; P.O.Box 1002.Hurst,Texas 76053 Tel.(817)510-6557;Fax.(817) 510-6559 CD BUILDERS, INC, General Contractors 2- the consequently inability to obtain supplies, materials and services when orders for such supplies and materials were timely made on the above referenced project. The above are excusable Non-Compensable Delays which are delays that are unforeseeable and beyond the control of CD Builders and for what we should be entitled to a time extension. Below follows the effect of the excusable Non-Compensable Delays in the project: Weather Conditions One item concerning weather which is worthy of note, is that CD Builders experienced additional time delays in terms of the effects of the rains, which were in addition to the day when it occurred the rain. For example, when CD Builders was doing site work and it rained, the site became saturated so that CD Builders was unable to work for maybe two or three additional days to the day that it rained. This situation occurred in this project because no improvement or treatment of soil subgrades for support of pavement was considered as part of the contract. Therefore, the City shall at least take into consideration the rain day requested even when it could have delayed two or three days been the actual time frame during which CD Builders was delayed because of the rain day. Among others,this prevented: 1- Excavations for pipes installation 2- Final Grading 3- Soil Compaction 4- Soil Compaction Tests 5- Installation of reinforcing steel 6- Pour of concrete paving The consequently inability to obtain supplies,materials and services The inability to furnish supplies, materials and services justify an extension of the completion date for a period equal to the length of the delay, which in this case were caused by rain days. As examples of the supplies, materials and services we include among others, the following: P.O. Box 1002,Hurst,Texas 76053 Tel. (817)510-6557;Fax.(817)510-6559 CD BUILDERS, INC. General Contractors Concrete The most common and important material affected by rain is the Concrete. In the event of rain, among others, the subbase is affected by the ability to condition and compact the soil and the installation of reinforcing steel. In addition, as you may know, the demand of concrete material in North Texas is extremely high because of all the construction projects going on in the area at the same time. In order for you to have concrete on a project, you need to schedule it with at least two (2) weeks in advance. This causes that if you needed to cancel a concrete pour for any reason, in this case rain, you lose your turn and need to reschedule your concrete, which can sometimes take up to two weeks to schedule. Landscaping Landscaping works run into the same problem in wet weather. Wet grass can't be cut to be delivered to the jobsite. Also, rain turns soil into sludge. Testing Services As another example, the City of Coppell who had the duty to provide the testing services in a sequence that permit CD Builders to finish the work on schedule, couldn't provide such services during the events of rain because of the soils conditions. Accordingly, as stated on our July 26th letter, there were 88 rain days during the duration of the project, which after analyzing its impact to the project schedule (CPM), resulted on a delay of 52 calendar days. Therefore, we hereby respectfully request a time extension of 52 calendar days to our contract completion date to take into consideration the above delays. All rights, remedies and defenses of CD Builders, Inc., are fully reserved and nothing herein shall be construed as an admission of liability or waiver of such rights or defenses. P.Q.Box 1002,Hurst,Texas 76053 Tel.(817)510-6557;Fax.(817)510-6559 CD BUILDERS, INC. General Contractors I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge,and that this Declaration was executed at Hurst,Texas. Respectfully submitted this 27th day of September,2016. CD Builders, Inc. 7:40-ACci) Francisco Luyando, PE, MECE Project Manager • P,O.Box 1002,Hurst,Texas 76053 Tel. (817)510-6557;Fax (817)510-6559