Loading...
Tax2013B-CS150414 • • cwidtrisvtDM ° Inn( Zvf xy {Y,,-►-G Eatro61, 1 bblK� M rt /e)Nj`) PRECONSTRUCTION CONFRENECE FOR TAX 2012 HIGHLAND MEADOW & EDGEWOOD REHABILITATION Sales Tax 2012 Residential Street Improvements 44g Y Aoku. 13Y WJ�&E.St *tiovv, Highland Meadow& Edgewood April 14th 2015 at 10:00am 1. Utilities in the Project a) Franchise Utilities • Digg Test 2. Prior to Construction a) Video, Photograph, Written notes of existing site conditions Water pressures GQ- 60FA 4 .4. c',-t -- b) Measure removal items c) Verify utility locations d) Post office coordination -. Gds N•o.•� O1�^a�s s .�fi 3. City of Coppell Guidelines a) Working hours, Overtime Work -1 ' 7 / tri-e-f" ( 1—3 ?M (1° •1 1° /PA 5‘"{"-. b) Changes to plans or specifications c) Set of Standard Details onsite d) Responsible party on site per NCTCOG 105.6 — nU • Water Utilities Dept. 972-462-5150 • All water to be metered • WATER VALVES TO BE OPERATED BY CITY OF COPPELL PERSONNEL ONLY e) Contractor Meetings • Monthly Estimate • Resident communications - wtc,IG Ik►v,e1 t 2 are-.-IGS a j 4. Project Specific Items W.r.-Vb • a) Traffic control plan • Ingress & Egress r ractors b) Sub- P• roject Involvement o G� `WrieS' u � t�� c) Protection of private property • Per Specific Project Requirements 1.16 prompt repair of damage is expected • Scheduled utility disruptions with proper resident notification —¢B Ir. tt d) Peculiar items of construction • Clean outs • New meters • Thrust blocks e) Final walk thru C � • General clean up `� • As-built • All resident releases 5. Submittals a) Responsible person per NCTCOG 105.6 0A.3 ht. • a b) List of sub-contractors with contact information c) Traffic control; plan d) Trench Safety Plan e) SWPPP 0 Materials 6. Testing a) Water • 150psi 4 hours • Bacteriological test ever 1000 feet • Latent pressure b) Sanitary Sewer • TV examination • Mandrel test c) Strengths d) Densities