PRECONSTRUCTION CONFRENECE FOR TAX 2012 HIGHLAND
MEADOW & EDGEWOOD REHABILITATION
Sales Tax 2012 Residential Street Improvements 44g Y Aoku. 13Y WJ�&E.St *tiovv,
Highland Meadow& Edgewood
April 14th 2015 at 10:00am
1. Utilities in the Project
a) Franchise Utilities
• Digg Test
2. Prior to Construction
a) Video, Photograph, Written notes of existing site conditions
Water pressures GQ- 60FA 4 .4. c',-t --
b) Measure removal items
c) Verify utility locations
d) Post office coordination -. Gds N•o.•� O1�^a�s s .�fi
3. City of Coppell Guidelines
a) Working hours, Overtime Work -1 ' 7 / tri-e-f" ( 1—3 ?M (1° •1 1° /PA 5‘"{"-.
b) Changes to plans or specifications
c) Set of Standard Details onsite
d) Responsible party on site per NCTCOG 105.6 — nU
• Water Utilities Dept. 972-462-5150
• All water to be metered
• WATER VALVES TO BE OPERATED BY CITY OF COPPELL
PERSONNEL ONLY
e) Contractor Meetings
• Monthly Estimate
• Resident communications - wtc,IG Ik►v,e1 t 2 are-.-IGS a j
4. Project Specific Items W.r.-Vb •
a) Traffic control plan
• Ingress & Egress
r
ractors
b) Sub- P• roject Involvement o G� `WrieS' u � t��
c) Protection of private property
• Per Specific Project Requirements 1.16
prompt repair of damage is expected
• Scheduled utility disruptions with proper resident notification —¢B Ir. tt
d) Peculiar items of construction
• Clean outs
• New meters
• Thrust blocks
e) Final walk thru C �
• General clean up `�
• As-built
• All resident releases
5. Submittals
a) Responsible person per NCTCOG 105.6 0A.3 ht. • a
b) List of sub-contractors with contact information
c) Traffic control; plan
d) Trench Safety Plan
e) SWPPP
0 Materials
6. Testing
a) Water
• 150psi 4 hours
• Bacteriological test ever 1000 feet
• Latent pressure
b) Sanitary Sewer
• TV examination
• Mandrel test
c) Strengths
d) Densities