Loading...
Gateway BP(1.4)-LR180125 Excess soil buildup should be removed. Excess soil buildup should be removed. BMPs not installed. Construction Storm Water Site Inspection Report Site Information Project Name: Havertys Warehouse Expansion Permit No.: TXR15774F Location: 770 Gateway Blvd, Coppell, Texas Date of Inspection: Start/End Time: 8:43 am to 9:14 am 1/25/2018 Inspector Name: Colette Khouri Inspector Title: Field Scientist Inspector Contact colette.khouri@terracon.com Information: Inspector Internal training, familiar with site SWPPP, and qualified compliance inspector training Qualifications: Describe present phase of Building structures, soil grading and concrete work. construction: Type of Inspection: Regular During storm event Post-storm event Weather Information Has there been a storm event since the last inspection? Yes No If yes, provide: Storm Start Date & Time: Storm Duration (hrs): Approximate Amount of Multiple Events Multiple Events Precipitation (in): 0.59 in. Weather at time of inspection: Clear Cloudy Rain Sleet Fog Snow High Winds Other: Temperature: 37 F Have any discharges occurred since the last inspection? Yes No If yes, describe: Rain event. Are there any discharges at the time of inspection? Yes No If yes, describe: N/A Responsive Resourceful Reliable 1 Site-specific Best Management Practices (BMPs BMP BMP Description BMP BMP Corrective Action Needed and Notes # Installed? Maintenance Required? 1 Excess soil buildup of more than 50% on the silt fence in the eastern perimeters of the site Silt Fence Yes No Yes No due to grading. 2 Stabilized Yes No Yes No Construction Exits 3 Inlet Protection Yes No Yes No 4 Concrete Wash out Concrete washout will be lined properly once Yes No Yes No Area concrete work continues. 5 Rock Check Dam Yes No Yes No 6 Filter Sock Filter sock should be installed. Yes No Yes No Responsive Resourceful Reliable 2 Overall Site Compliance BMP Activity Description BMP Maintenance Corrective Action Needed and Notes # Implemented? Required? 1 Natural resource areas (e.g., streams, wetlands, mature Yes No Yes No N/A trees, etc.) protected with barriers or similar BMPs 2 Perimeter controls and sediment barriers Yes No Yes No N/A installed and maintained 3 Discharge points and receiving waters Yes No Yes No N/A protected from sediment deposits 4 Construction exit to prevent sediment from Yes No Yes No N/A being tracked into the street 5 Washout facilities (e.g., paint, stucco, Concrete washout will be lined properly once concrete) available, Yes No Yes No N/A concrete work continues. clearly marked, and maintained Comments Describe any corrective action(s) or incident(s) of non-compliance not described above (attach pictures if applicable): 1. Excess soil buildup of more than 50% on the silt fence in the eastern perimeters of the site due to grading. 2. Concrete washout will be lined properly once concrete work continues. Responsive Resourceful Reliable 3