Loading...
WA9302-CS 951010SHIMEK, JACOBS FINKLEA '? CONSTRUCTION REPORT ProjeetNo. 94155 Date: 10-10-95 Prepared Is This A By: Matt Hiekey ('~ ~ Working Day? [] Yes [] No Owner: City of Coppell Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Contractor: NATGUN Time Allotted: 300 Used: 79 Number Superintendent: Roy Twombley Men Working: 17 Hours: 9:00 AM to 9:50 AM Weather Conditions: Overcast and Cool Site Conditions: The site was dry and in good condition. WORK DESCRIPTION 1. A meeting was held with Larry Davis, Richard Gee, Gary Hendricks, Matt Hiekey and Roy Twombley to discuss the revised testing scope. Richard Gee showed concern over the amount of shotcrete samples required for each test panel. Natgun requires six samples to be tested per test panel, while Richard Gee estimated four samples per test panel. Larry Davis indicated that he would check the amount of testing samples used in the existing ground storage tank. 2. One hundred eighty one piers have been completed. 3. Four drilling rigs, one lift, one backhoe, one skytrack and one concrete truck were operating on the site. 4. Steel workers were on site and constructing the steel cages for the piers.