DR16-02-CS180218 Request For Information RFI No.: 002 Contractor:Ark Contracting Services, LLC Project:Grapevine Creek Bank Stabilization Owner:City of Coppell Refer to Drawing/Spec: Engineer:Teague Nall & Perkins Attachments:1 Problem Identification or Question: There are 2 existing trees that will be in the way of our gabions; where it turns into the bank. Should we remove these trees or can we go around them? Initiator of Request:Tiffany Rawls, ARK,PM Date:2.8.18 Suggested Resolution: See attached drawing with proposal for going around existing trees. With previous discussions with the homeowners they do not want to lose the trees. We can go around them by changing the angle. We suggest this approach. Suggested Resolution By:Tiffany Rawls, ARK, PM Date: 2.8.18 Resolution Per request of contractor and approval of city inspector, TNP will adjust the Beginning wall station location and extend walltowards the west eight ft. (8 ft.) to save the larger oak tree but the smaller tree will need to be removed since it is too far down the hill and interfereswith top of wall finish grading.Per discussion with contractor field representative no change order request will be required for this alterationin wall alignment. See attached drawing sheet 4, Revision 1 for drawing changes. Reviewed By: Project Engineer:Keith BurkholderDate:2/14/18 Resolution By:Keith Burkholder________ Company / Section:TNP Title:PM Date:2/14/18 Distribution: Project ManagerOwnerFile Construction ManagerOriginator Office ManagerConst. Liaison Engr., DesignerContractor O:\\PROJECTS\\CPL16346\\docs\\construction admin\\RFI's\\RFI 002\\RFI 002_TNP Response 2018-02-14.docx 03/2010