Loading...
Gateway BP(1.4)-LR180215 Construction Storm Water Site Inspection Report Site Information Project Name: Havertys Warehouse Expansion Permit No.: TXR15774F Location: 770 Gateway Blvd, Coppell, Texas Date of Inspection: Start/End Time: 8:31 am to 9:05 am 2/15/2018 Inspector Name: Colette Khouri Inspector Title: Field Scientist Inspector Contact colette.khouri@terracon.com Information: Inspector Internal training, familiar with site SWPPP, and qualified compliance inspector training Qualifications: Describe present phase of Building structures, soil grading and concrete work. construction: Type of Inspection: Regular During storm event Post-storm event Weather Information Has there been a storm event since the last inspection? Yes No If yes, provide: Storm Start Date & Time: Storm Duration (hrs): Approximate Amount of Multiple Events Multiple Events Precipitation (in): 0.01 in. Weather at time of inspection: Clear Cloudy Rain Sleet Fog Snow High Winds Other: Temperature: 68 F Have any discharges occurred since the last inspection? Yes No If yes, describe: Rain event. Are there any discharges at the time of inspection? Yes No If yes, describe: N/A Responsive Resourceful Reliable 1 Site-specific Best Management Practices (BMPs BMP BMP Description BMP BMP Corrective Action Needed and Notes # Installed? Maintenance Required? 1 Silt Fence Yes No Yes No 2 Stabilized Yes No Yes No Construction Exits 3 Inlet Protection Yes No Yes No 4 Concrete Wash out Concrete washout will be lined properly once Yes No Yes No Area concrete work continues. 5 Rock Check Dam Yes No Yes No 6 Liner has been installed in place of filter socks. Liner has holes in it and should be replaced. Filter Sock Yes No Yes No alternative sediment control that is compatible with traffic inlet structures. Responsive Resourceful Reliable 2 Overall Site Compliance BMP Activity Description BMP Maintenance Corrective Action Needed and Notes # Implemented? Required? 1 Natural resource areas (e.g., streams, wetlands, mature Yes No Yes No N/A trees, etc.) protected with barriers or similar BMPs 2 Perimeter controls and sediment barriers Yes No Yes No N/A installed and maintained 3 Discharge points and receiving waters Yes No Yes No N/A protected from sediment deposits 4 Construction exit to prevent sediment from Yes No Yes No N/A being tracked into the street 5 Washout facilities (e.g., paint, stucco, Concrete washout will be lined properly once concrete) available, Yes No Yes No N/A concrete work continues. clearly marked, and maintained Comments Describe any corrective action(s) or incident(s) of non-compliance not described above (attach pictures if applicable): 1. Concrete washout will be lined properly once concrete work continues. 2. Liner has holes in it and should be replaced. 3. sediment control that is compatible with traffic inlet structures. Responsive Resourceful Reliable 3