Loading...
Gallini Addition-CS 950323 (2)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS X-lO92P,, ~ Addition, zoning clumge from A (Agriculture) to 12-S.U.P. (Single Family-12, Special Use Permit) to allow the construction of a preschool on 0.91 acre of property located north of DeForest and east of MacArthur Blvd., at the request of Blake DRC DATE: March 23, 1995 & March 30, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: ~. ..~-,~-~·~"w A ·.~PRELIM:~.~,~ :~ '~ Site Plan Comments: 1. As has previously been stated, this subdivision needs to go through the floodplain reclamation process prior to development. This property is also within the limits of the Corridor Development Certification. Therefore, it will need to obtain CDC permit. The CDC permit process, in addition to other requirements, requires valley storage. 2. The fire lane should be a minimum of 25 foot in width. 3. The radius for the driveway connection at DeForest Road should be shown with a minimum of 20 feet. 4. It appears as though two parking spaces should be removed at the back of the site to provide for a proper turn around for vehicles parking in the rear of the facility. Developer Information Comments: 1. Impact fees for roadway, water and sewer will be required. 2. A landscape plan should be provided. 3. You may want to consider a separate irrigation service. It will be less costly on your monthly sewer bill. Utility Plan Comments: 1. The utility plan should match the site layout as shown on the site plan.