Loading...
Georgetown Plaza-CS 930429Se The property in the floodplain, on Lots 14-35, Block E should be included as part of the Homeowners Association, not part of the private lots. Also, access to that common area should be provided. The floodway should be labeled. The master plan shows a future 30' sewer line along the southern property line between MacArthur and Village Parkway. If MUD is satisfied that the current 27" is sufficient, then a letter should be provided from the MUD District. 2. The note concerning the variable width floodplain/floodway easement should be revised as noted at the DRC meeting. 3. A letter is still required from the MUD District concerning the existing 27~ MUD line between MacArthur Blvd. and Village Parkway. Georgetown Plaza Shopping Center. 1. Sidewalks along Samuel Blvd. should be constructed. 2. Some type of agreement should be worked out between St. Ann's Catholic Church and the City of Coppell to allow access across the existing paved surface along the northern part of this property when needed during the construction of Sandy Lake Road. 3. Escrow for Sandy Lake Road should be paid if that has not already been paid with the initial platting of the property. Staff is currently researching the issue. Heartz Road Elementary School F'mal Plat (Town Center Elementary School). 1. Escrow and/or an escrow agreement should be executed for the schools responsibility for the future construction of the street along the west side of the property for the ring road. 1. The floodway behind Lots 14-35, Block E should be labeled Floodplain/Floodway. May 6th, 1993 Final Comments: