Loading...
WA9302-CS 950926SHIMEK, JACOBS & FINKI,EA CONSTRUCTION REPORT Project No. 94155 Date: 9-26-95 Prepared ~'/ Is This A By: Matt Hickey V~ Working Day? [] Yes [] No Owner: City of Coppell Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Contractor: NATGUN Time Allotted: 300 Used: 65 Number Superintendent: Roy Twombley Men Working: 11 Hours: 9:00 AM to 9:40 AM Weather Conditions: Overcast Site Conditions: Dry with some trash on the Pad WORK DESCRIPTION 1. Eighty nine piers have been completed. 2. The defective pier is completed at a depth of 49 feet. 3 One pier was drilled and another was poured.. 4. Safety caps were placed on all exposed steel from the piers. 5. One drilling rig was out of service and will be replaced. 6. Larry Davis requested that 1% of the piers completed need to have their elevations verified by our survey crew. * · We are to schedule the survey by our crew for later this week. 7. Larry Davis showed concern over the removal of excess drilling debris on the select fill of the pad.** · * We are to verify the contractor's efforts for this phase of construction and report back to Larry Davis. 8. Two drilling rigs, one lift, one backhoe, one Sky Track and two concrete trucks were on site.