Freeport NIP(5.2)-CS 980325~. c~^8..~i~. BORE / STREET CUT/SAW CUT
PERMIT
IN RIGHT-OF-WAY / EASEMENT / PRIVATE PROPERTY
Engineering Department
PERMIT FEE: $100.00
(No Charge to Franchise Utility)
Approved plans must be provided. Erosion Control is required.
A letter from the Property Owner/Engineer/Developer is required before permit will be issued.
Date: .,March 9.5, 1008
Project Name: ~,hnna r Pcb
Permit Issued to: En.~l-ar Mot. workirlg Corporation
Address: 8~o4 Esters Blvd. Suite 840
Telephone: (979) qgq-5967 g. mer~ncy Telephone-'
RepresentMg: Ma~atech
I~pector: T~l~phon~-
General Description of ~pe of work Crovide copy of approved plam):
Cnnduir placement between 445 Royal Ln.& 600 Royal Lane
Location of Work (location map required):
600 Royal Ln.
Contact made with City and/or franchise utility to locate existing utilities?
(48 hours prior to excavation)
YES x NO
Is any excavation of pavement in street, alley or sidewalk necessary?
(If YES, attach Permit) YES NO x
Revised 5/95
Bore/Street Cut/Saw C..¢ Permit
Page 2
ltd
Representative(s) of the Franchise/Contractor must adhere to all construction standards
approved by the City of Coppell, which includes but is not limited to: Compaction of trenches
and bores, and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work
(grading, drainage, vegetation, erosion control).
Any excavation requiring closing of a street or alley must be reported to the Police (304-3600),
Fire (304-3500), Street (304-3546) and Engineering Departments (304-3679) prior to closing.
Attach Work Order (franchise only).
Attach barricade plan / trench safety plan if a lane or street closure is r.:quired.
rancnise / Contractor tqepresentative Date
Franchise Iaspector or, C~ty_Inaspector Date ...........
~Approved J City Representative Date
Applicant shall indemnify and forever hold harmless against each and every claim, demand :or
cause of action that may be made or come against it by reason of or if any way arising out of
the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under
permit from the City, if such permit is granted.
All franchise utilities must contact 304-3545 or 304-3546 for trench, ditch and open pit
inspections prior to backfill. Backfilling must meet all construction standards approved by the
City of Coppell.
l borepmt.frm