Loading...
Freeport NIP(5.2)-CS 980112 Coppell. Texas 75019 //~--~/~ The City With A Beautiful Future 972-462-0022 ~'"~//~~~' (~oOpBp~LXL¢7T8E¢ ' XAS 75019 .'"t Mr. Robert Ahmuty MEPC American Properties, Inc. Suite 100 LB10 Dallas, Texas 75248 RE: MEPC III Final Acceptance Dear Mr. Ahmuty: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector cc: Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Travis Cramp, Fire Marshal John Jacobson, MacFadden & Miller file/ldavis/0finalae.