Loading...
Freeport NIP(5.2)-CS 970610 MEMORAN'DU -:'-M (~ To: Ken Griffin P. E.., Dir. of Engineering & Public Works From: Lan3' Davis, Construction Inspector RE: Preconstruction Meeting for MEPC Phase III Date: June 10, 1997 A preconstruction conference for the referenced project has been scheduled for Friday, June 13, 1997 at 8:30 a.m. on the job site for utility construction and paving. If you should have any questions concerning this project, please feel free to call me. cc: Mike Martin P.E., Assistant City Engineer Building Inspection, Greg Jones, Building Official Coppell Fire Division, Travis Crump, Fire Marshall Matt Cast, Water and Sewer Superintendent MacFadden and Miller, Erral Faith Fax (972) 401-1399 fileildavis/mepciii, pre