Georgian Place-CS 990830 (2) / ~ The City With A Beautiful Future 972-462-0022
(~ /~/ P.O. BOX478
~ COPPELL, TEXAS 75019 FILE
August 30, 1999
George Tannous
BeHe Vista Homes
17110DallasParkway, Suite l20
Dallas, Texas75248
RE: Street Light Fee Assessment / Georgian Place
Dear Sir:
The following assessment represents the number of light units as established by TU Electric for
Georgian Place:
6 lights @ $292.60 per light = $1755.60
Prior to the final acceptance of this project, a check in the amount of $1755.60 should be made
payable to the City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a
copy of the street light fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to verify payment of
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convenience.
Sincerely .
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
CC:
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Glenn Hollowell P.E., Asst. Dir. of Public Works
STREET LIGHTING
~ER
SERVICE
City of Coppell
ELECTRIC COMPANY {"Company"), and
SUPPLEMENT
, Texas ("C~/'9 and TEXAS UTILITIES
_(.' '__D eyeloper' '_If applicable)
City requests and authorizes Company to provide street lighting activity as follows below and on sketch(s)
attached hereto and made a part hereof.
/ WR #1135882
AcfJorls: AddJtJorl Removal [] Georgian Place Addition
· I, Group , Luminaire/Pole Type : (See Attached Sketch)
1 100 S A 12' Europ~_~n I Dr @ Georgian Dr
t ~i Georgian Drive @
1 10 HPS A " i Lot 5 Blk "B"
1~00 -- I Georgian Drive @ --
1 t HPS A ,, ~1 Lot 7 Blk "A"
/
1 / 100 HPS A'iGe°rgian
Drive
" , Lot 12 Blk "A':
i Georgian Drive
1 100 HPS A " i -.Lot I1 Blk
Sandy Lake Road @
1 , 100 HPS A " , Georgian Drive
Under these additional conditions (if any)
(CONTINUED ON BACK)
1. City or Developer agrees to pay Company $__ in consideration of Company's agmement to install said street
lights and unde,~nds that no construction work will begin until after Company has received full payment.
2. Company agrees to install, own, operate and maintain said street lights in accordance with its street lighting agree-
ment with customer. However, ~f City or Developer fails to pay, on ,demand, the amount indicated above, this supple-
mental agreement is~ automatically terminated.
3. All parties agree that Company will retain far its use and benefit the payment received hereunder in consideration' of
its obligation to install said street lights and that Company at all times has title to, and complete ownership and
of, said street lights.
4: Company is not liable for loss or injury causal by delay or failure to install lhe electric facilities necessary to serve
customer because of delay in receiving shipments of required material, orders or formal requests of governmental
agencies, acts of God or the public enemy, inevitable, accidents, fire, explosions, strikes, riots, war, or any other causes
reasonably beyond control of Company. If Company i~ prevented from instolliag ~uch electric facilities by any of the
above muses, Company agrees to retum to City or Developer, without interest, the entire amount of City or Developer's
payment, thereby terminating this supplement and Company's obligation to provide the electric facilities described heroin.
5. This agreement is entered into subject to the terms of the Agreement for Street Ughting Service between City and
Company dated
ACCEr~r.D BY COM?ANY
TXU Electric
Engineering Analyst Sr.
DATE SIGNED
July 27, 1999
ACCEFI~D ~' CITY
Coppell
TTrLE L {"
DATE SlGJ4ED
ACCEPTED BY DEVELOF~R (ff appllcablel