Loading...
Georgian Place-CS 990505 (2)The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 May 5, 1999 George Tannous Belle Vista Homes 17110 Dallas Parkway, Suite 120 Dallas, TX 75248 Georgian Place Fee Assessment Letter Park Development Zone ' Zone 1 Dear Mr. Tannous: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy o f the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $107,525.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This mount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fees can be assessed.' Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project: 'We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Georgian Place Date: 5/5/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $16,875.00 $16,875.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $1,800.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $898.45 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $56.44 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,225.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100 % due at Issuance of Water Meter) Wastewater Impact Fee $15,750.00 $15,750.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $1,750.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $1,750.00 (100% due at Issuance of Building Permit) Park Fee $44,975.00 $44,975.00 (100% due prior to Council Approval) Roadway Impact Fee $29,925.00 $29,925.00 (100 % due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project il Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $115,034.89 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $107,525.00 DEVELOPMENT FEE WORKSHEET PROJECT: Georgian Place DATE: 5/5/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 35 - 5/8 inch X 3/4 inch = 35 ESU's 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 37.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 36 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 35 Domestic Meter(s) @ $25.67 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $56.44 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 35 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 35 @ $450.00 ea. $16,875.00 $1,800.00 $898.45 $56.44 $0.00 $o.oo $1,225.00 $30.00 $15,750.00 Wastewater Tap Inspection Fee: Total #: 35 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 35 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $1,750.00 $1,750.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 35 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Zone 1 $44,975.00 $o.oo $29,925.00 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Georgian Place DATE: 5/5/99 ROADWAY IMPACT FEE: ~ervice Area * 5 Category ** Residential Land Use ** Single-Family Detached No. Lots/Units 35 Development Units ** 35.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $29,925.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)