Georgian Place-CS 990412TIPTON ENGINEERING, INC.
ENGINEERING · SURVEYING · PLANNING 4344
6330 Broadway Blvd. · Suite C · Garland, Texas 75043 · (972) 226-2967 · FAX (972)226-1946
April 12, 1999
Mr. Michael Martin
CITY OF COPPELL
255 Parkway Blvd.
Coppell, Texas 75019
RE: GEORGIAN PLACE
COPPELL, TEXAS
Dear Mr. Martin:
It is our understanding t~om the developer that he has only accepted items 1 and 2 from the enclosed
proposal. They are currently attempting to renegotiate the other items. Therefore, based on items
1 and 2 we calculate the partial inspection fee for the above referenced project to be as follows:
Excavation Contract
Inspection Fee ($35,000.00 ~ 2%)
$35,000.00
$700.00
If you have any questions or if we can be of any further assistance, please do not hesitate to contact
our office.
Sincerely,
TIPTON ENGINEERING, INC.
David Tipton
Enclosure
C' I::ilcs\l ,FT'['[3i:S 4344 lnsp t-cc.dc~c
APR-12-1999 15:10
BALFOUR TEXAS
9?2 960 1134 P.01/01
Bid Proposal
Georgian Place
999
1. Cl~arincj lump sum
2l 8000 yards excavation e $1.75
~_ ~ !:".: ::ugh ~-_~?~ ~
Exclusions: St~king Testing Erosion control
21000.00
14000.00
$159950.00
Hourly Rates
08 Dozer
D7 Dozer
TD8 DOzer
955 Loader
953 L~ader
951 Loader
12G Blade
20 yd. Openbowl Scraper
22 yd. Paddle sc=aper
16 yd. Paddle Scraper
Trailer Truck % 20 ydS.
Water Truck
85.00
?.,i. O0
65.00
75.00
75.00
?0.00
'75.00
100.00
110.00
95.00
65.00
37.50
On hourly rates: Time ends on Saturday, billed on ~onda¥
with payment on Friday that week.
Rains
TOTAL P. 01