Loading...
Georgian Place-CS 990412TIPTON ENGINEERING, INC. ENGINEERING · SURVEYING · PLANNING 4344 6330 Broadway Blvd. · Suite C · Garland, Texas 75043 · (972) 226-2967 · FAX (972)226-1946 April 12, 1999 Mr. Michael Martin CITY OF COPPELL 255 Parkway Blvd. Coppell, Texas 75019 RE: GEORGIAN PLACE COPPELL, TEXAS Dear Mr. Martin: It is our understanding t~om the developer that he has only accepted items 1 and 2 from the enclosed proposal. They are currently attempting to renegotiate the other items. Therefore, based on items 1 and 2 we calculate the partial inspection fee for the above referenced project to be as follows: Excavation Contract Inspection Fee ($35,000.00 ~ 2%) $35,000.00 $700.00 If you have any questions or if we can be of any further assistance, please do not hesitate to contact our office. Sincerely, TIPTON ENGINEERING, INC. David Tipton Enclosure C' I::ilcs\l ,FT'['[3i:S 4344 lnsp t-cc.dc~c APR-12-1999 15:10 BALFOUR TEXAS 9?2 960 1134 P.01/01 Bid Proposal Georgian Place 999 1. Cl~arincj lump sum 2l 8000 yards excavation e $1.75 ~_ ~ !:".: ::ugh ~-_~?~ ~ Exclusions: St~king Testing Erosion control 21000.00 14000.00 $159950.00 Hourly Rates 08 Dozer D7 Dozer TD8 DOzer 955 Loader 953 L~ader 951 Loader 12G Blade 20 yd. Openbowl Scraper 22 yd. Paddle sc=aper 16 yd. Paddle Scraper Trailer Truck % 20 ydS. Water Truck 85.00 ?.,i. O0 65.00 75.00 75.00 ?0.00 '75.00 100.00 110.00 95.00 65.00 37.50 On hourly rates: Time ends on Saturday, billed on ~onda¥ with payment on Friday that week. Rains TOTAL P. 01