Gibbs Sta DCEC-CS 941025 reed engineering
GEOTECHNICAL CONSULTANTS
October 25, 1994
Project No. 1691.1
Report No. 3
Craig Olden, Inc.
P.O. Box 1500
Little Elm, Texas 75068
ATTN: Mr. Tony Peyton
Re: Construction Materials Testing
Denton Creek at Gibbs Station
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses the activities of September 7 and 19, 1994.
On the referenced dates, a total of six field density tests were
taken the gabion wall backfill. Test results are shown on Plate 1.
Where tested, materials were found to be in compliance with project
specifications.