Loading...
Gibbs Sta DCEC-CS 940622 (2) ~ Specialists in Gabion Construction, Soil Stabilization and Craig Olden, Inc. Erosion Control Structures General Contractors For Two Decades June 22, 1994 City of Coppell P. O. Box 478 Coppell TX 75019 FAX# 393-0948 Attention: Mr. Tarry Davis Construction Inspector RE: Embankment Stability Remediation Block E, Lots 28 ard 29, Gibbs Station Phase II 912 Creek Crossing - 916 Creek Crossing - 920 Creek Crossing 924 Creek Crossing - 928 Creek Crossing - 932 Creek Crossing Coppell, Texas COINC 94-08 Dear Mr. Davis, By this letter, we respectfully request permission to work on Saturday, June 25, 1994 at the above project site East of Creek Crossing. We agree to pay any overtime charges required to employ your services as Construction Inspector for the City of Coppell. We will begin work at 8:00 A.M. and cease no later than 5:00 P.M. We will call you before 4:00 P.M. on Friday, June 24th should we decide not to work on the aforementioned date. If you have any questions concerning this project, please do not hesitate to call me. Sincerely, O%ris D~xon Construction Managor C~ recycled paper P.O. Box 1500 · Little Elm, Texas 75068 Dallas Metro 214/294-5000 .D/FW Metro 214/691-1815 *I-800-GABIONS · FAX 214/294-2664