Loading...
Gibbs Station 1-LR 921203ALPHA TESTING, INc. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF REID COMPACTION TESTS TESTED FOR: HEATH & KNIGHT PROPERTIES, INC. DATE: DALLAS, TEXAS 12/03/92 PROJECT: GIBBS STATION LAKES OF COPPELL COPPELL, TEXAS OUR REPORT NO, 92020-147 TEST DATA: I 1OIL iO OPTIMUM MAXIMUM i. AI IO PLACE IN PLACE #OIITUII NY OI#IITY MOIITUBI I#T li#~ITY Fl# ClOT COMMENT· T EST D ATE NUMi~,ii I~CF qb pCI~ COMPA,gTIO# NO. _ .... ~ 737 12/03 FG 17 22.3 95.9 24.0 93 97 i-A 738 12/03 FG 17 22.3 95.9 24.7 93 97 1-A 739 12/03 FG 17 22.3 95.9 24.1 92 96 1-A TEST LOCATION: 737 BLOCK D LOT 15 738 BLOCK D LOT 17 739 BLOCK D LOT 19 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. C;[vlCN'[' r2~A/'ED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST