Loading...
Gibbs Station 2-LR 931029 ALPHA TESTING, INC. REPORT OF CONCRETE 2209 W,scons,n St COMPRESSION TEST Suite 100 ?. ,.-,, Dallas. Texas 75229 '/ (214) 620-8911 TFSTEDFOR GIBBS STATION, LTD DATE: [0/29/93 C/O HEATH & KNIGHT PROPERT[ES DALLAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--50 PHASE I! COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAVEI~IENT ROUND ROCK CIRCLE STA. 1+00 DATE PLACED 10/29/93 PLANT ON SITE TIME 3 = 15 DELIVER TICKET NO. SLUMP 2" MIX PROPORTIONS (SSD) N/A AIR CONTENT 5,1 CEMENT AIR TEMPERATURE 60 WATER CONCRETE TEMPERATURE 70 FINE AGGREGATE DATE RECEIVEO 10/30/93 COARSE AGGREGATE FIELD DATA SUBMITTED BY D~ ADMIXTURE MIX DATA SUBMITTED BY EH LACY COMPRESSION TEST RESULTS REMARKS (NOMINAL CYLINDER SIZE 6" X 12"! ;"-/Cylinders made by ALPHA representabve. Lab. Customer ! Type Date ~ Comlar~ive ~ Cylinders made by Architect's I No. No. Curing Te~ed ; Days Swen~h, Psi or. Contractor's representative. 65 93384 LAB 11/05/93 i 7 3920 hnders picked up by ALPHA ' laboratory. 66 93384 LAB 11/26/93 ' 28 5820 ~ Cylinders delivered to ALPHA ~ laboratory. ~ 67 93384 LAB 11/26/93 28 62 .~ 0 ~--~'~_,ompression test results comply with i applicable specifications. 68 93384 LAB HOLD ! ; L_J Compression test results do no( comply i with applicable specifications. i - '.s,,~: .... ~"~, I 28 3600 TYP~J;~URE. IF OTHER