Gibbs Station 2-LR 931029 ALPHA TESTING, INC. REPORT OF CONCRETE
2209 W,scons,n St COMPRESSION TEST
Suite 100
?. ,.-,, Dallas. Texas 75229
'/ (214) 620-8911
TFSTEDFOR GIBBS STATION, LTD DATE: [0/29/93
C/O HEATH & KNIGHT PROPERT[ES
DALLAS, TEXAS
PROJECT GIBBS STATION OURREPORTNO. 93384--50
PHASE I!
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAVEI~IENT ROUND ROCK CIRCLE
STA. 1+00
DATE PLACED 10/29/93 PLANT ON SITE
TIME 3 = 15 DELIVER TICKET NO.
SLUMP 2" MIX PROPORTIONS (SSD) N/A
AIR CONTENT 5,1 CEMENT
AIR TEMPERATURE 60 WATER
CONCRETE TEMPERATURE 70 FINE AGGREGATE
DATE RECEIVEO 10/30/93 COARSE AGGREGATE
FIELD DATA SUBMITTED BY D~ ADMIXTURE
MIX DATA SUBMITTED BY EH LACY
COMPRESSION TEST RESULTS REMARKS
(NOMINAL CYLINDER SIZE 6" X 12"! ;"-/Cylinders made by ALPHA
representabve.
Lab. Customer ! Type Date ~ Comlar~ive ~ Cylinders made by Architect's
I No. No. Curing Te~ed ; Days Swen~h, Psi or. Contractor's representative.
65 93384 LAB 11/05/93 i 7 3920 hnders picked up by ALPHA
' laboratory.
66 93384 LAB 11/26/93 ' 28 5820 ~ Cylinders delivered to ALPHA
~ laboratory.
~ 67 93384 LAB 11/26/93 28 62 .~ 0 ~--~'~_,ompression test results comply with
i applicable specifications.
68 93384 LAB HOLD !
; L_J Compression test results do no( comply
i with applicable specifications.
i -
'.s,,~: .... ~"~, I 28 3600
TYP~J;~URE. IF OTHER