Gibbs Station 2-LR 931029 (03) ALPHA TESTING, INC. REPORT OF CONCRETE
2209 Wiscons,n St COMPRESSIONTEST
Suite 100
././/. Dallas. Texas 75229
.,i (214) 620-8911
TFSTEDFOR GIBBS STATION, LTD DATE. 10/29/93
C/O HEATH & KNIGHT PROPERTIES
ALAS, TEXAS
PROJECT GIBBS STATION OURREPORTNO. 93384--48
PHASE II
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT PAVEMENT CREEK CROSSING
STA. 12+00
DATE PLACED 10/29/93 PLANT OH SITE
TIME 11:50 DELIVER TICKET NO. N/A
SLUMP 2 a MIX PROPORTIONS (SSD) N/A
AIR CONTENT 5.3 CEMENT N/A
AIR TEMPERATURE 71 WATER N/A
CONCRETE TEMPERATURE 70 FINE AGGREGATE N/A
DATE RECEIVED 10/30/<)3 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY D~J ADMIXTURE N/A
MIX DATA SUBMIT[ED BY EH LACy
REMARKS
COMPRESSION TEST RESULTS __/
NOMINAL CYLINDERSlZE6'X 12"! ~------" C~ ylinders made by ALPHA
representative.
: Lab. Customer Type ' Date i Aee ComlmrmWa __ Cylinders made by Architect's
No. No. Curing Te~tad i DeVI Stren~h, Psi or Contractor's representative.
57 93384 I LAB 11/05/<)3 ' 7 4210 ylinders picked up by ALPHA
, laboratory.
58 93384 : LAB 11/26/93 28 6200 ,.--1Cylinders delivered to ALPHA
laboratory.
59 93384 LAB l 1/26/93 28 6530 '~.,~'C°mpression test results comply with
applicable specifications.
60 <)3384 LAB HOLD i ~] Compres~on test results do not comply
; with applicable specifications.
28
3600
TYPE O~RE. IF OTHER