Loading...
Gibbs Station 2-LR 931029 (03) ALPHA TESTING, INC. REPORT OF CONCRETE 2209 Wiscons,n St COMPRESSIONTEST Suite 100 ././/. Dallas. Texas 75229 .,i (214) 620-8911 TFSTEDFOR GIBBS STATION, LTD DATE. 10/29/93 C/O HEATH & KNIGHT PROPERTIES ALAS, TEXAS PROJECT GIBBS STATION OURREPORTNO. 93384--48 PHASE II COPPELL, TEXAS FIELD DATA LOCATION OF CONCRETE PLACEMENT PAVEMENT CREEK CROSSING STA. 12+00 DATE PLACED 10/29/93 PLANT OH SITE TIME 11:50 DELIVER TICKET NO. N/A SLUMP 2 a MIX PROPORTIONS (SSD) N/A AIR CONTENT 5.3 CEMENT N/A AIR TEMPERATURE 71 WATER N/A CONCRETE TEMPERATURE 70 FINE AGGREGATE N/A DATE RECEIVED 10/30/<)3 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY D~J ADMIXTURE N/A MIX DATA SUBMIT[ED BY EH LACy REMARKS COMPRESSION TEST RESULTS __/ NOMINAL CYLINDERSlZE6'X 12"! ~------" C~ ylinders made by ALPHA representative. : Lab. Customer Type ' Date i Aee ComlmrmWa __ Cylinders made by Architect's No. No. Curing Te~tad i DeVI Stren~h, Psi or Contractor's representative. 57 93384 I LAB 11/05/<)3 ' 7 4210 ylinders picked up by ALPHA , laboratory. 58 93384 : LAB 11/26/93 28 6200 ,.--1Cylinders delivered to ALPHA laboratory. 59 93384 LAB l 1/26/93 28 6530 '~.,~'C°mpression test results comply with applicable specifications. 60 <)3384 LAB HOLD i ~] Compres~on test results do not comply ; with applicable specifications. 28 3600 TYPE O~RE. IF OTHER