Loading...
ST0001-CS000711 0'7--.'00P03:51 RCVD Pacheco Koch Consulting Enginee:s July i l, 2000 PK No.: i958-00.042 Mr. Mike Martin, P.E. CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 I J4 Re: CREEKVIEW DRIVE EXTENSION Freeport North Coppell, Texas Dear Mr. Martin: Transmitted herewith, via courier service delivery, please find enclosed the following prints for your approval: No. Date Description 3 07/11/00 Revised Civil Plans 1 06/27/00 City "Red-Lines" 1 07/11/00 Response Letter to City's Questions If the enclosures are not as noted above, please contact this office immediately. If you have any questions regarding the enclosed items or need any additional information, please call me at your convenience. Sincerely, CJE/as 1958-236 enc. cc: Paul Brown - Duke-Weeks Tom Trocheck - Duke-Weeks Steve Kennedy - Duke-Weeks II 11 l' I !' IT' I' [ ........; "' Pacheco Koch Co~sultir~g E~gineers July 11, 2000 PK No.: 1958-00.042 Mr. Mike Martin, P.E. CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 j4 Re: CREEKVIEW DRIVE EXTENTION Freeport North Coppell, Texas Dear Mr. Martin: Enclosed herewith please find the responses to comments contained on City's Plan Review Sheet dated 6/27/00. 1. Plans have been modified to show 30 Ibs. per square yard as the minimum. 2. Plans reflect the change from jiggle bars to double round white reflective buttons. 3. Sign added to plans in both directions and are located in the median nose. 4. This note was added in the General Notes and is located on Sheets C-1.0, C-2.4. 5. This note was added in the General Notes and is located on Sheets C-1.0, C-2.4. 6. Plans have been modified as requested 7. As per our conversation it is my understanding that Hill & Wilkinson will remove that pavement which is required to install the sanitary sewer line to the existing manhole. These plans have been modified to show the additional pavement which will be required the replace that which was removed. 8. As per my conversation with Brad Reid (Park Planning and Landscape Manager) he stated that he did not believe that any mitigation will be required with-in a public dedicated Right of Way, but that he would notify Pacheco Koch after checking into it. A fence is located with in the Right of Way, Duke Weeks will contact the church to see if replacing it will be an issue. 9. Plans have been modified as requested. 10. Plans have been modified to show the placement of a "Dead End" sign. 11. Plans have been modified to so that all grading will take place within the public Right of Way. An easement should not be required. 12. The Drainage Area Map (C-2.2) has been modified to show the offsite elevations to the west. These Contours will show that Creekview Drive is located on a ridge which acts as a drainage divide between Freeport North and the Church's property. 13. Plans have been modified to show that Drainage Area three extends to Bethel Road. 14. During the course of designing the this road a preliminary layout of Creekview Drive from the existing end of pavement to Bethel Road was generated. This layout shows that the entire road has the capacity and slope to drain all portions of the Right of Way to the two curb inlets provided. TIT t i ~" l ....l ........i" Mr. Mike Martin July 11, 2000 Page 2 15. Plans have been modified to show a proposed 20-foot drainage easement for Lateral "A-18" and Line "ST-2". Pacheco Koch is in the process of generating an exhibit for the dedication, once completed and signed by the owner it will be forwarded to the City of Coppell. If you have any questions or need any additional information, please do not hesitate to call. Sincerely, C.~J'ackvan~s ~ ~ CJE/as 1958-231 cc: Paul Brown - Duke-Weeks ............... 1I 'T"'i ....Ii l' I!' II!"I .......~